Loading...
HomeMy WebLinkAboutOperational Report for Ramon To: M. Rebecca Loader, Library Director From: Ramon Gomez, Library Clerk Subject: September Operational Report Date: September 25, 2007 COLLECTION PROJECTS I. Withdrawn Items A. : Items were withdrawn from the system and recycled. Magazines B. : Magazine labels were typed. Damaged Item Shelf: C. The Damaged Item shelf was checked and cleaned up. MAINTENANCE PROJECTS II. th Security Gates: A. Filters were cleaned on September 12. st Air Fresheners: B. Fresheners were replaced on September 21. st Fire Extinguishers: C. Fire extinguishers were checked on September 21 Public Works: D. Public Works was called to do maintenance on the library for cob web cleaning, hanging an occupancy sign in the Activity Room, tightening a door handle, and replacing sliders on the bottoms of upholstered chairs. MISCELLANEOUS III. ILL Drawer: A. Drawers were maintained. Paperback Display: B. Maintained new paperback display near the front desk. ACL Last Copies: C. Last Copies of books Columbia Heights owns were withdrawn. Training: D. Assisted in the training of a new employee in regards to the process of attaching materials. rg