HomeMy WebLinkAboutOperational Report for Ramon
To: M. Rebecca Loader, Library Director
From: Ramon Gomez, Library Clerk
Subject: September Operational Report
Date: September 25, 2007
COLLECTION PROJECTS
I.
Withdrawn Items
A. : Items were withdrawn from the system and recycled.
Magazines
B. : Magazine labels were typed.
Damaged Item Shelf:
C. The Damaged Item shelf was checked and cleaned up.
MAINTENANCE PROJECTS
II.
th
Security Gates:
A. Filters were cleaned on September 12.
st
Air Fresheners:
B. Fresheners were replaced on September 21.
st
Fire Extinguishers:
C. Fire extinguishers were checked on September 21
Public Works:
D. Public Works was called to do maintenance on the library for cob
web cleaning, hanging an occupancy sign in the Activity Room, tightening a door handle,
and replacing sliders on the bottoms of upholstered chairs.
MISCELLANEOUS
III.
ILL Drawer:
A. Drawers were maintained.
Paperback Display:
B. Maintained new paperback display near the front desk.
ACL Last Copies:
C. Last Copies of books Columbia Heights owns were withdrawn.
Training:
D. Assisted in the training of a new employee in regards to the process of
attaching materials.
rg