Loading...
HomeMy WebLinkAboutResolution No. 2006-131 RESOLUTION NO. 2006-131 BEING A RESOLUTION ESTABLISHING A FIRE DEPARTMENT FEE SCHEDULE WHEREAS, the Columbia Heights Fire Department provides many services, such as contract inspections, plan reviews, and permits; and WHEREAS, State contracts, State Statute, and City Ordinance allows for fees to be charged for these services; and WHEREAS, currently no fees are charged for these services; and WHEREAS, the Columbia Heights Fire Department chooses to establish a fee schedule to reflect the costs incurred; NOW THEREFORE BE IT RESOLVED, that the attached proposed fee schedule be adopted effective January 1, 2007. Passed this 28th day of August, 2006 Offered by: Seconded by: Roll call: Diehm Williams Ayes: Peterson, Williams, Nawrocki, Diehm, Kelzenberg cA~~ ~ ffi atricia Muscovitz, CMC Deputy City Clerk/Council Secretary New Construction/ Modifications/Fire Review: Minnesota State Fire Code Fee Structures: $45.00 New construction/modification fire review fee. 105.4 Automatic Fire-Extin2uishim! Systems: New construction/modification fire review fee. 105.7.1 $90.00 Fire Alarm and Detection Systems and Related Equipment: 1 {\I:;: '7 "l (!' A t: {\{\ New construction/modification fire review fee. IVJ./.J 4)'"tJ.vv Fire Pumps and Related Equipment: New construction/modification fire review fee. If part of an automatic fire-extinguishing system review no separate 105.7.4 $45.00 fee will be charged. Standpipe Systems: New construction/modification fire review fee. Ifpart of an automatic fire-extinguishing system review, no 105.7.11 $45.00 separate fee will be charged. Spray Rooms. Dip Tanks. or Paint Booths: New construction/modification fire review fee. 105.7.10 $45.00 LP Gas: Exterior installations only: Plan review and inspections to $180.00 be conducted by Fire Department. 105.7.8 Interior installations only: New construction/modification $90.00 fire review fee. Flammable & Combustible Liquids: New construction/modification fire review fee. 105.7.5 90.00 Hazardous Materials: New construction/modification fire review fee. 105.7.6 90.00 Temporary Membrane Structures. Tents and Canopies: Less than 180 days: Plan review and inspections to be $90.00 conducted by Fire Department. 105.7.12 $45.00 Under a Conditional Use Permit. Greater than 180 days: New construction/modification fire $45.00 review fee. TYPE OF ACTIVITY AUTHORITY FEE Recreational Fire Permit: Daily (up to 10 per year) Chapter 8, Article $0.00 Annual IV of City Code $10.00 Festival Bonfire $100.00 Permit Bum (requires Council approval) $500.00 Motel/Hotel Inspections Triennial inspection fee of$435.00 and a per room charge Inspected of $5 for 1-18 units, $6 for 19-35 units, $7 for 36 to 100 SS299F.46 and annually at units and $8.00 for more than 100 units. Fee includes one State contract. 1/3 the follow-up inspection. $225 for each additional follow-up total fee. inspection. School Inspections: Inspected Public Schools: Triennial inspection fee of$0.014 per annually at square foot for each school. ($0.00466 per year). Includes 1/3 the 2 follow-up inspections. $0.00466 for each additional SS299F.47 and total fee. follow-up inspection above two. State Contract Charter Schools: $100 for each building inspected. $100.00 Alternative Schools: $100 for each building inspected. $100.00 Day Care Inspections: $50.00. $50.00 per inspection. SS245A.151 and Includes State contract. follow-up inspections Abatements: Administrative fee added to the cost of the abatement. Chapter 8, Article $200.00 Covers cost of office staff time. II of City Code Explosives: Operational permit required for the manufacture, storage, handling, sale or use of any quantity of explosive material MSFC 105.6.15 $0.00 within the scope of Chapter 33 of the MN State Fire Code. " . >> by State Fire" If{ _i_ _. ) h: Fireworks: Outdoor fireworks displays by State certified operator. SS624.22 $50.00 Fireworks sales in existing retail establishments. SS624.20 $0.00 Fireworks stands or tent sales. (NFPA 1124) SS624.20 $200.00