HomeMy WebLinkAboutResolution No. 2006-131
RESOLUTION NO. 2006-131
BEING A RESOLUTION ESTABLISHING A
FIRE DEPARTMENT FEE SCHEDULE
WHEREAS, the Columbia Heights Fire Department provides many services, such as
contract inspections, plan reviews, and permits; and
WHEREAS, State contracts, State Statute, and City Ordinance allows for fees to be
charged for these services; and
WHEREAS, currently no fees are charged for these services; and
WHEREAS, the Columbia Heights Fire Department chooses to establish a fee schedule
to reflect the costs incurred;
NOW THEREFORE BE IT RESOLVED, that the attached proposed fee schedule be
adopted effective January 1, 2007.
Passed this 28th day of August, 2006
Offered by:
Seconded by:
Roll call:
Diehm
Williams
Ayes: Peterson, Williams, Nawrocki, Diehm, Kelzenberg
cA~~ ~
ffi
atricia Muscovitz, CMC
Deputy City Clerk/Council Secretary
New Construction/ Modifications/Fire Review: Minnesota State
Fire Code Fee
Structures: $45.00
New construction/modification fire review fee. 105.4
Automatic Fire-Extin2uishim! Systems:
New construction/modification fire review fee. 105.7.1 $90.00
Fire Alarm and Detection Systems and Related
Equipment: 1 {\I:;: '7 "l (!' A t: {\{\
New construction/modification fire review fee. IVJ./.J 4)'"tJ.vv
Fire Pumps and Related Equipment:
New construction/modification fire review fee. If part of
an automatic fire-extinguishing system review no separate 105.7.4 $45.00
fee will be charged.
Standpipe Systems:
New construction/modification fire review fee. Ifpart of
an automatic fire-extinguishing system review, no 105.7.11 $45.00
separate fee will be charged.
Spray Rooms. Dip Tanks. or Paint Booths:
New construction/modification fire review fee. 105.7.10 $45.00
LP Gas:
Exterior installations only: Plan review and inspections to $180.00
be conducted by Fire Department. 105.7.8
Interior installations only: New construction/modification $90.00
fire review fee.
Flammable & Combustible Liquids:
New construction/modification fire review fee. 105.7.5 90.00
Hazardous Materials:
New construction/modification fire review fee. 105.7.6 90.00
Temporary Membrane Structures. Tents and
Canopies:
Less than 180 days: Plan review and inspections to be $90.00
conducted by Fire Department.
105.7.12 $45.00
Under a Conditional Use Permit.
Greater than 180 days: New construction/modification fire $45.00
review fee.
TYPE OF ACTIVITY AUTHORITY FEE
Recreational Fire Permit:
Daily (up to 10 per year) Chapter 8, Article $0.00
Annual IV of City Code $10.00
Festival Bonfire $100.00
Permit Bum (requires Council approval) $500.00
Motel/Hotel Inspections
Triennial inspection fee of$435.00 and a per room charge Inspected
of $5 for 1-18 units, $6 for 19-35 units, $7 for 36 to 100 SS299F.46 and annually at
units and $8.00 for more than 100 units. Fee includes one State contract. 1/3 the
follow-up inspection. $225 for each additional follow-up total fee.
inspection.
School Inspections: Inspected
Public Schools: Triennial inspection fee of$0.014 per annually at
square foot for each school. ($0.00466 per year). Includes 1/3 the
2 follow-up inspections. $0.00466 for each additional SS299F.47 and total fee.
follow-up inspection above two. State Contract
Charter Schools: $100 for each building inspected. $100.00
Alternative Schools: $100 for each building inspected. $100.00
Day Care Inspections: $50.00.
$50.00 per inspection. SS245A.151 and Includes
State contract. follow-up
inspections
Abatements:
Administrative fee added to the cost of the abatement. Chapter 8, Article $200.00
Covers cost of office staff time. II of City Code
Explosives:
Operational permit required for the manufacture, storage,
handling, sale or use of any quantity of explosive material MSFC 105.6.15 $0.00
within the scope of Chapter 33 of the MN State Fire Code.
" . >> by State Fire" If{ _i_ _. )
h:
Fireworks:
Outdoor fireworks displays by State certified operator. SS624.22 $50.00
Fireworks sales in existing retail establishments. SS624.20 $0.00
Fireworks stands or tent sales. (NFPA 1124) SS624.20 $200.00