HomeMy WebLinkAboutOperational Report from Joanne
To: M. Rebecca Loader, Library Director
From: Joanne Peterson, Library Clerk
Subject: March Operational Report
Date: March 29, 2006
I COLLECTION PROJECTS
Withdrawn Items.
A Items were withdrawn from the system and recycled.
Magazines.
B Magazine labels were typed.
Paperback Book Order.
C One book order was sent. Books received were
checked in.
II MAINTENANCE PROJECTS
A. Fire Extinguishers.
Gauges were checked on March 21, 2006.
B. Security Gates.
Filters were cleaned on March 21, 2006.
C. Public Works
. Contacted Public Works about light bulb replacements, folding
door repair in lower level, bathroom threshold repair and coat hook installation.
D. Heights Electric
. Contacted about an estimate for new light sockets in the West
Reading room.
E. Air Fresheners
. Air fresheners were replaced on March 21, 2006.
III MISCELLANEOUS
A ILL Drawer.
. Drawers were maintained.
B. Paperback Display.
Maintained new paperback display near the front desk.
C. Irish Book Display.
Set up a fiction display of Irish fiction books near the
paperback section.
Romance Paperback Display.
D. Set up a display of new romance paperbacks near
the romance section.
E. Shelf Reading Assignments.
April shelf reading was assigned.
F. Damage Shelf.
Reviewed items on the damage shelf.
jlp