HomeMy WebLinkAboutResolution No. 2006-031
RESOLUTION 2006-31
BEING A RESOLUTION ORDERING IMPROVEMENT AND
THE PREPARATION OF PLANS FOR ZONES 7B AND lA STREET REHABILITIA TION
CITY PROJECT 0502
WHEREAS, Resolution 2006-12 of the Columbia Heights City Council adopted the 23rd day of January,
2006, fixed a date for a Council hearing on the proposed improvement bounded on University A venue on
the east, 3ih Avenue on the south, California and Main Street on the west, and 45tl1 Avenue on the north,
and Reservoir Blvd on the east, 37th Avenue on the south, Central Avenue on the west and 45th Avenue on
the north,
AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were
given, and the hearing was held thereon the 6tl1 day of March, 2006, at which all persons desiring to be
heard were given an opportunity to be heard thereon.
WHEREAS, the Council detennines to proceed with this local improvement, a portion of the cost being
defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA
HEIGHTS, MINNESOTA:
1. That the location and extent of such improvements is as follows:
FULL STREET RECONSTRUCTION
1. 38tl1 Avenue Dead-end to Main Street
2. 2nd Street 37tl1 Avenue to 38th Avenue
3. 2nd Street 39th Avenue to 40th Avenue
4. 2Yz Street 37tl1 Avenue to Edgemoor Place
5. Edgemoor Place 2Yz Street to 3rd Street
Work includes required utility reconstruction/repair, required water service replacement/
repair, new granular subbase if needed, new aggregate base, new concrete curb and gutter
with driveway aprons, new bituminous surfacing, required concrete or bituminous driveway
and walk/step replacement, sod restoration, miscellaneous construction items, and
appurtenances.
PARTIAL STREET RECONSTRUCTION
1. California Street 39lh A venue to Cul-de-sac
2. 2nd Street 38th Avenue to 39th Avenue
3. 2Yz Street Edgemoor Place to 3rd Street
4. 3rd Street Edgemoor Place to 40tl1 Avenue
Work includes required utility reconstruction/repair, required water service replacement/
repair, new granular subbase if needed, new aggregate base, spot replacement of curb and
gutter with required concrete or bituminous driveway and walk/step replacement, new
bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances.
MILL AND OVERLAY
1. 39tl1 Avenue
2. Edgemoor Place
3. 3rd Street
4. 38tl1 Avenue
5. 42nd Avenue
6. 2nd Street
7. Tyler Place
California Street to Main Street
2 Yz Street to 40tl1 A venue
38th Avenue to Edgemoor Place
3rd Street to Dead-end
2nd Street to 3rd Street
43rd Avenue to 44th Avenue
43 Yz A venue to 45tl1 A venue
8. 43 Yz Avenue
9. 44Yz Avenue
10. Buchanan Street
Dead-end to Cul-de-sac
Tyler Place to Cul-de-sac
44Yz Avenue to 45th Avenue
Work includes required utility reconstruction/repair, spot replacement of curb and gutter with
required concrete or bituminous driveway and walk/step replacement, milling of existing
street surface, new bituminous surfacing, sod restoration, miscellaneous construction items,
and appurtenances.
2. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility
report.
3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 23rd day
of January, 2006.
4. These improvements shall also be known as Project 0502 and PIRs:
CV 2006-7B-02-00 1 for Full Street Reconstruction,
CV 2006-Z7-03-001 for Partial Street Reconstruction, and
CV 2006-Z7-44-001, CV 2006-Z1-44-001, CV 2006-Z1-44-002 for Mill and Overlay.
5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such improvement.
Adopted by the Council this 6tl1 day of March 2006.
Offered by: Kelzenberg
Seconded by: Williams
Roll Call: Ayes: Peterson, Williams, Nawrocki, Ericson Diehm, Kelzenberg
~~ \fVl~-uv~
Patricia Muscovitz, CMC