Loading...
HomeMy WebLinkAboutResolution No. 2006-031 RESOLUTION 2006-31 BEING A RESOLUTION ORDERING IMPROVEMENT AND THE PREPARATION OF PLANS FOR ZONES 7B AND lA STREET REHABILITIA TION CITY PROJECT 0502 WHEREAS, Resolution 2006-12 of the Columbia Heights City Council adopted the 23rd day of January, 2006, fixed a date for a Council hearing on the proposed improvement bounded on University A venue on the east, 3ih Avenue on the south, California and Main Street on the west, and 45tl1 Avenue on the north, and Reservoir Blvd on the east, 37th Avenue on the south, Central Avenue on the west and 45th Avenue on the north, AND WHEREAS, ten days' mailed notice and two published notices of the hearing a week apart were given, and the hearing was held thereon the 6tl1 day of March, 2006, at which all persons desiring to be heard were given an opportunity to be heard thereon. WHEREAS, the Council detennines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: 1. That the location and extent of such improvements is as follows: FULL STREET RECONSTRUCTION 1. 38tl1 Avenue Dead-end to Main Street 2. 2nd Street 37tl1 Avenue to 38th Avenue 3. 2nd Street 39th Avenue to 40th Avenue 4. 2Yz Street 37tl1 Avenue to Edgemoor Place 5. Edgemoor Place 2Yz Street to 3rd Street Work includes required utility reconstruction/repair, required water service replacement/ repair, new granular subbase if needed, new aggregate base, new concrete curb and gutter with driveway aprons, new bituminous surfacing, required concrete or bituminous driveway and walk/step replacement, sod restoration, miscellaneous construction items, and appurtenances. PARTIAL STREET RECONSTRUCTION 1. California Street 39lh A venue to Cul-de-sac 2. 2nd Street 38th Avenue to 39th Avenue 3. 2Yz Street Edgemoor Place to 3rd Street 4. 3rd Street Edgemoor Place to 40tl1 Avenue Work includes required utility reconstruction/repair, required water service replacement/ repair, new granular subbase if needed, new aggregate base, spot replacement of curb and gutter with required concrete or bituminous driveway and walk/step replacement, new bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances. MILL AND OVERLAY 1. 39tl1 Avenue 2. Edgemoor Place 3. 3rd Street 4. 38tl1 Avenue 5. 42nd Avenue 6. 2nd Street 7. Tyler Place California Street to Main Street 2 Yz Street to 40tl1 A venue 38th Avenue to Edgemoor Place 3rd Street to Dead-end 2nd Street to 3rd Street 43rd Avenue to 44th Avenue 43 Yz A venue to 45tl1 A venue 8. 43 Yz Avenue 9. 44Yz Avenue 10. Buchanan Street Dead-end to Cul-de-sac Tyler Place to Cul-de-sac 44Yz Avenue to 45th Avenue Work includes required utility reconstruction/repair, spot replacement of curb and gutter with required concrete or bituminous driveway and walk/step replacement, milling of existing street surface, new bituminous surfacing, sod restoration, miscellaneous construction items, and appurtenances. 2. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered as proposed in the Council Resolution adopted 23rd day of January, 2006. 4. These improvements shall also be known as Project 0502 and PIRs: CV 2006-7B-02-00 1 for Full Street Reconstruction, CV 2006-Z7-03-001 for Partial Street Reconstruction, and CV 2006-Z7-44-001, CV 2006-Z1-44-001, CV 2006-Z1-44-002 for Mill and Overlay. 5. The City Engineer, Kevin Hansen, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Council this 6tl1 day of March 2006. Offered by: Kelzenberg Seconded by: Williams Roll Call: Ayes: Peterson, Williams, Nawrocki, Ericson Diehm, Kelzenberg ~~ \fVl~-uv~ Patricia Muscovitz, CMC Deputy City Clerk/Council Secretary