Loading...
HomeMy WebLinkAboutOperational Report from Joanne To: M. Rebecca Loader, Library Director From: Joanne Peterson, Library Clerk Subject: January Operational Report Date: January, 2006 I COLLECTION PROJECTS Withdrawn Items. A Items were withdrawn from the system and recycled. Magazines. B Magazine labels were typed. Paperback Book Order. C One book order was sent. II MAINTENANCE PROJECTS A Fire Extinguishers. Gauges were checked on January 30, 2005. B Security Gates. Filters were cleaned on January 30, 2005. C. Public Works . Contacted Public Works about basement bathroom that needed new flush handle and various laminate surface items that needed re-gluing. D. Water Meter Replacement . Contacted two plumbers for bids on water meter st replacement. Replacement is set for February 1. E. Heat Exchanger . Contacted two heating and air conditioning firms for estimates on repair/replacement of a roof heat exchanger. III MISCELLANEOUS A ILL Drawer. Drawers were maintained. B. Paperback Display. Maintained new paperback display near the front desk. C. Valentine/Romance Display. Set up and maintained a romance book display near the paperback book section. D. Shelf Reading Assignments. February shelf reading was assigned. E. Damage Shelf. Reviewed items on the damage shelf. F. PC Management Training. Received training for the new PC Management system. jlp