HomeMy WebLinkAboutOperational Report from Joanne
To: M. Rebecca Loader, Library Director
From: Joanne Peterson, Library Clerk
Subject: August Operational Report
Date: August 19, 2005
I COLLECTION PROJECTS
Withdrawn Items.
A Items were withdrawn from the system and recycled.
Magazines.
B Magazine labels were typed.
Hudson Map Order.
C Placed order for 2006 Hudson Map books.
II MAINTENANCE PROJECTS
Fire Extinguishers.
AGauges were checked on August 19th, 2005.
Security Gates.
B Filters were cleaned on August 19th, 2005.
nd
C. Mat Cleaning.
Scheduled the floor cleaning for August 2, 2005.
D. Fix-It List.
Coordinated with Public Works to have a several repair/fix-it items
taken care of at the library.
III MISCELLANEOUS
ILL Drawer.
A Drawers were maintained.
B. Paperback Display.
Maintained the display near the circulation desk and “books
in a basket” display featuring culinary mysteries.
C. Page Training
. Provided training for three page trainees for nearly 30 hours in
August.
jlp