HomeMy WebLinkAboutOctober 28, 2003PLANNING AND ZONING COMMISSION
MINUTES OF THE REGULAR MEETING
OCTOBER 28, 2003
7:00 PM
The meeting was called to order at 7:00 pm by Chairperson, Ted Yehle.
Roll Call: Commission members present- Peterson, Szurek, Schmitt, Bakerl and Yehle.
Also present were Tim Johnson (City Planner), Bob Streetar (Community Development Director),
Kevin Hansen (Public Works Director), Shelley Hanson (Secretary), Tami Ericson (Council Liaison),
and Ciara Schlicting (From Dahlgren, Shardlow, and Uban).
Motion by Szurek, seconded by Schmitt, to approve the minutes.from the meeting of September 2,
2003 as submitted All ayes. MOTION PASSED.
PUBLIC HEARINGS
Case #: 2003-1014-15
Preliminary Plat, Site Plan Review of Grand Central Lofts
Applicant: Nedegaard Custom Homes
Address: 4707, 4747, 4757, 4801, 4811, 4849 Central Avenue NE, Columbia Heights, MN
Zoning:
Transit Oriented Mixed Use Development District
Nedegaard Custom Homes has requested the approval of the Preliminary Plat and Site Plan of
properties located at 4707, 4747, 4757, 4801, 4811, and 4849 Central Avenue NE. Bob Streetar,
Community Development Director, provided some background on the site and how a task force made
up of residents, business owners, and the developer worked together to arrive at the concept being
proposed in this plan. He then introduced Ciara Schlicting from Dahlgren, Shardlow, and U-ban who
made the presentation to the Commission and people in attendance.
Ms. Schlicting explained this project is bounded by 49th Avenue on the north, Cheery Heights
Neighborhood on the east, 47TM Ave on the south, and Central Avenue on the west. This new project
area will be referred to as Grand Central Lofts.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 2
An application has been made by Nedegaard Custom Homes ("the Developer"), the owner of the
subject property, for Preliminary Plat approval and Site Plan review for the Grand Central Lofts, a
redevelopment of the Kmart Site. Proposed are 218 units of for-sale housing with price points
ranging from $170,000 to $330,000. The housing includes three condominium buildings containing
66 units each and 20 townhomes in four groupings, with associated open space. Future phases of
development will include a community center and commercial uses.
Two actions will be taken by the Planning Commission--one for the Preliminary Plat and one for the
Site Plan.
The Preliminary Plat review only pertains to the portion of the Kmart redevelopment area that
contains the vacant Kmart store and parking lot and the Arby's site. The Site Plan review pertains to
the entire residential portion of the site plan except for design of the townhomes. The community
center building design will be reviewed at such time as the final program and design of the center has
been determined. The commercial site plan and building design will be reviewed as part of a future
development phase.
The Grand Central Lofts Site Plan has been designed in accordance with the goals and objectives of
the Kmart Redevelopment Concept Plan developed by the Kmart Advisory Group under the guidance
of the City Council. In May 2003, the City of Columbia Heights initiated a planning process for the
Kmart Site for the purpose of creating a redevelopment plan for the outdated and mostly vacant retail
center. Goals of the plan include more employment opportunities within the City, new housing
option previously not available in the City, increased oPportunities for transit use, amenities to
promote walking and biking, and an improved image and vitality of Central Avenue. A City
Council-established citizen advisory group and the Developer worked closely to create the Concept
Plan to meet the needs of both the community and the Developer.
Planning Considerations
Comprehensive Plan
1)
Approval of the Comprehensive Plan designation for this site was recommended by the Planning
Commission on August 2, 2003; approved by the City Council on August 11, 2003; and
approved by the Metropolitan Council on August 21, 2003.
2)
The Comprehensive Plan designation for the property is Transit Oriented Development.
Specifically, the Comprehensive Plan states that these areas "will focus on the commuting needs
of Columbia Heights residents. As a result, a higher percentage of service-oriented
commercial/retail development will be necessary with high-density residential development
providing the. balance of the development. Mixed-Use pedestrian-oriented development near
transit nodes'will provide oppommities for high-density residential and neighborhood
commercial development. Redevelopment of these areas will also provide the opportunity for
pedestrian linkages to other parts of the community and improvement of the overall non-
motorized circulation system within the community that will help improve the image of
Columbia Heights."
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 3
3)
The proposed Kmart redevelopment complies with the Comprehensive Plan designation: · The development is located along an existing transit route;
· New residents will be able to commute to work via the existing transit routes;
· The development will occur in phases, with the initial phase being high-density residential
development. Subsequent phases will include commercial development and a community
center. Patrons of the existing and new commercial areas will be able to patronize any new
business via transit;
· A high percentage of the area will continue to provide service-oriented commercial/retail
along Central Avenue and new higher densi/y residential uses will balance the development
and provide a transition' fi.om commercial development to the adjacent residential areas;
and
· The development will provide pedestrian connections to and through the subject properties.
Zoning Ordinance
4)
5)
6)
7)
The zoning classification for the property is Mixed-Use District. The Planning Commission
recommended approval of the rezoning on September 2, 2003. The first reading of the City
Council for the rezoning was held on Sepiember 22, 2003. The second reading of the City
Council was held on October 13, 2003. Rezoning officially takes effect on November 13, 2003.
The purpose of the Mixed Use District is to promote development and redevelopment that
facilitates linkages and interaction of transit services, housing and neighborhood services. The
focus of land use within this district is to ensure a pedestrian friendly environment and
pedestrian connections to and fi.om residential development and transit facilities. The mix of
land use shall be flexible to help facilitate a successful development. The minimum density
allowed is 12 units/acre and the maximum density is 20 units/acre.
The proposed Kmart redevelopment complies with zoning designation. The size of the subject
property is approximately 14.91 acres. A total of 218 units are proposed for the site, for a
density of 14 units/acre. Residential uses are comprised of three condominium buildings
containing 66 units each and four groupings oftownhomes containing a total of 20 units.
The proposed plat is divided into four outlots. Outlot A contains the three condominium
buildings, community center and pond; Outlot B contains the 20 townhome units, open space,
and ponds; Outlot C will contain commercial uses in future phases of development; and Outlot
D is comprised of a sloped landscaped buffer that will be privately owned and maintained.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28,2003
PAGE 4
Circulation, Access, Parking and Sidewalks
8)
Circulation through the site is provided through a new public right of way that hms along the
western boundary of the site from 47th Avenue to 49t~ Avenue. A privately-maintained interior
roadway circulates through the rest of the site providing access to the condominium garages and
townhome garages, as well to the community center site and on-street parking spaces.
9)
10)
11)
12)
The new right-of-way access at 47th Avenue does not align directly with Tyler Street but is off
set. It is not the ideal alignment, but given site constraints, City Staff finds it acceptable.
The parking requirement for multiple family biaildings is two covered spaces per every two-
bedroom unit and one covered space for every one-bedroom unit. The condominium buildings
meet this requirement. Each building contains a total of 66 units. There will be a maximum of
62 2-bedroom units and a minimum of 4 1-bedroom units. There will be 128 garage spaces per
building, satisfying the requirements for both 1- and 2-bedroom units. The parking requirement
for townhomes is two covered spaces per unit. There are 20 units, each with a two-car garage,
for a total of 40 parking spaces. Additionally, there are 83 on-street parking spaces, for a total of
507 spaces at the development.
The performance standards for the Mixed Use District require sensitivity to adjacent usable open
space and include pedestrian/bicycle connections to enhance existing circulation patterns. The
development will provide approximately 5 acres of green space (34% of site area) and .77 acres
of sidewalks (5% of site area). The green space includes areas of open space surrounding ponds
and buildings. The sidewalks consist of trails around open space areas, along the edges of the
condominium buildings and surrounding the interior edge of the development. When Outlot C
is developed in a later phase, the internal sidewalk on the 47th Avenue side of the development
will be extended to Central Avenue. Additionally, staff encourages the extension of the
sidewalk east toward Fillmore.
The Fire Department indicated that access to the condominium buildings may be restricted. The
comer radii of the privately-maintained interior roadway, which circulates around the
condominiums, may not allow emergency vehicles (e.g., fire tracks) to move around freely. The
turning radii of the interior roadways need to accommodate emergency vehicles. The on-street
vehicle parking shown around two of the condominium buildings, Block 2 and Block 3, may
restrict the access of fire equipment. Before final plat approval, the Site Plan will need to assure
that adequate access to the condominium buildings is provided. Also, the location of the
proposed fire hydrant located on the south side of 47th Avenue does not benefit the site due to
topography. A fire hydrant should be located on the south side of Outlot A.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 5
Transit
13)
The transit stop servicing northbound traffic currently stops just north of 47th Avenue, directly
in front of Arby's. The transit stop servicing southbound traffic currently stops on the Hilltop
side of Central, on the northwest side of 47th and Central. The development currently includes a
sidewalk along the edge of the residential development along 47th Avenue, and will include a
sidewalk link to Central Avenue as part of the development of the commercial parcel, Outlot C.
The City Staff and the Developer have talked with Metro Transit about possible site
improvements to the Metro Transit stops along the west side of Central Avenue to enhance
transit use from the development. The city and Developer agree that these improvements are
crucial to drawing transit users from the development.
Lot Lines and Setbacks
14)
Building setbacks in the zoning district are regulated by the final site plan and development
agreement approved by the City Council, based on the following findings: a) the setbacks
provided adequate distances from uses in adjacent districts, and b) the setbacks maintain and
enhance the character of the neighborhood in which the mixed-use development is located. The
setbacks shown on the site plan provide adequate distances to adjacent properties and provide an
urban character on the interior of the develoPment appropriate for mixed use development.
15)
The preliminary plat and site plan show proposed land swaps occurring with the property at
4811 Central Avenue for the purpose of right-of-way configuration and the property at 4849
Central Avenue for the purpose of maximizing the amount of fight-of-way, and therefore
buffering, between the proposed roadway and the property located at 1040 49th Avenue. These
land swaps must be completed and reflected on the final plan prior to approval of the final plat.
Landscape Plan
16)
The Developer has submitted a Landscape Plan in accordance with the requirements for site
plans in the Zoning Ordinance. The Landscape Plan is well done and consistent both with the
Zoning Ordinance and with the Highway District Design Guidelines. In fact, the Landscape
Plan exceeds many of the requirements of the Ordinance with respect to plant sizes and
quantities. The one aspect in which the Landscape Plan does not meet the Zoning Ordinance
concerns coniferous plantings, although we believe the intent of the Zoning Ordinance is met.
The Ordinance requires that the plantings include 25 percent Evergreens. The plans show 17
percent. However, the plan provides an excess of the required amount of street trees, with one
tree per 30 feet rather than the required one tree per 50 feet. We believe that these additional
streets trees maintain the integrity of the landscape design and balance out the need for
additional evergreens. Adding more evergreens would mean removing street trees, and we find
the plan as shown to be preferable.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 6
Minor revisions should be made to the Landscape Plan prior to final plat approval, with respect
to the following issues:
· The list of trees is extensive and should be reorganized to show the breakdown of trees into
different categories and/or planting hierarchies for the site to ensure the trees are falling
into appropriate categories (such as street tree species, open space species, water/pond edge
species, and buffer/slope species). Specifically, certain trees shown would not be
acceptable as street trees, such as Silver Maple or Willows; therefore categories should be
clarified.
· The stairway to 47th Avenue is shown on the site plan but is not noted on the Landscape Plan.
This note should be added.
· The plantings shown at the edge of trails and ponds are noted to be 6 to 8 ft in height.
Confirmation should be made that the heights of these plants do not impact views into and
out of the open space.
· A typical planting plan should be provided to show the types of plantings that Will occur at the
edge of private patios in the courtyard areas of the condominium buildings.
· The Landscape Plan should include a note that addresses slope and general drainage.
· Consideration should be .given to breaking up the repetition of the privacy wall adjacent to the
4 tll . .
property at 1040 9 Avenue through vaned heights of plants, such as shrubs and
perennials.
17)
The landscape plan shows buffering through plantings, fencing and a boulder retaining wall to
th . th
buffer the property at 1040 49 Avenue from the new pubhc roadway and access at 49 Avenue.
The landscape plan is appropriate for purposes of providing an aesthetic and safety buffer,
subject to confirmation to the City Engineer that adequate sight triangles are preserved from the
new roadway toward 49th Avenue.
Maintenance
18)
The private elements of the developmer~t, including all buildings, private roads, sidewalks,
ponds, open space, landscaping, including the landscape buffer adjacent to 1040 49th Avenue,
and all utilities out of the public fight of way will be maintainec~ by the Grand Central Loft
Homeowners Association in accordance with approved Homeowners Association covenants.
Highway District Design Guidelines
The Columbia Heights Design Guidelines were created to guide developers and businesses in the
design of expansions, renovations or new construction of buildings or parking within the Central
Avenue and 40th Avenue commercial corridors, and to assist City officials and staff in reviewing
development proposals. The guidelines are mandatory, but the City may permit alternative
approaches that meet the objectives of the design guidelines. The design district that is applied
to the Grand Central Lofts is the Highway District.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 7
Architectural Guidelines
1)
2)
3)
Building Placement Objective: To orient non-residential buildings toward the street in order to
improve its walkability, while creating oppommities for more internally-focused residential
development. Residential buildings may be oriented toward Central Avenue or toward internal
streets or courts, with side fagade parallel to Central Avenue. Fa9ades parallel to Central
Avenue should be well-detailed and service areas should not be located along the Central
Avenue frontage. The frontage should be appropriately landscaped.
· The development meets this objective. The residential development is separated from
Central Avenue by existing commercial development. The residential development is
focused toward internal courtyards and streets. The rear facades of the western most
condominium building and townhome grouping is parallel to Central Avenue and is well-
detailed. Appropriate Iahdscaping is provided.
Primary Facades and Roof Treatment Objective: To encourage attached residential and mixed-
use buildings that are compatible with the prevailing single-family residential surroundings.
Residential buildings may be designed with flat or pitched roofs. A variety of roof shapes and
parapet details are encouraged; however, non-structural, purely decorative roof elements should
be avoided.
· The development meets this objective. The condominiums have a flat r6of and the entries
and windows on the first floor relate to human scale.
· The townhomes have pitched roofs with a variety of peak heights. The townhomes are
complementary to the design of houses in adjacent neighborhoods and evoke the same
design as the "northeast Minneapolis bungalow."
Building Width and Faqade Articulation Objective: To add visual interest and variety to
buildings and emphasize the pedestrian scale. The primary faqades of buildings should be 40 ft.
or more in width and should be articulated into smaller increments by following methods listed
in the Design Guidelines to lessen apparent bulk.
· The minimum fa¢ade width of the cbndominium buildings exceed the 40 ft. requirement
and are articulated into smaller increments by projections and balconies.
· The minimum facade widths of the townhome groupings exceed the 40 ft. requirement.
The facades are articulated in part through windows, door and garage door placement. The
facades are also articulated through the use of complementary materials, including stone
veneer, stucco, copper roof structures over bay windows, decorative half timbering, and
cedar brackets and along with other faqade ornamentation.
Building Height Objective: To create increased sense of enclosure, diminish the perceived
width of the street, and provide opportunities for upper-story housing, offices or studios. Two
and three story buildings are strongly encouraged. All buildings shall have a minimum cornice
height of 22 feet. This height is adequate to achieve the building height objective, conveying a
multi-story appearance even if the building has only one occupied floor.
· The condominium buildings are 4 stories and approximately 43 ft. from foundation to the
roof.
· The townhomes are one and two stories. They have a maximum height of 36.5 feet and
have the appearance of two stories. These buildings are in keeping with nearby single- and
two-family housing units.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 8
5) Transparency - Window and Door Openings Objective: To reflect the character of existing
storefront commercial buildings, enliven the streetscape and enhance security by providing
views into and out of buildings. For residential buildings, a minimum of 20 percent of primary
(street facing) fagades and 15 percent of each side or rear faqade shall consist of window and
door openings as specified in the guidelines.
· The condominium building contains entries, balconies and windows along the front and
rear fagades and balconies and windows along the side facades to meet this requirement.
The window shape, size and patterns emphasize the organization of the fagade and the
definition of the building.
· The townhomes include window and door openings to provide sufficient views out of
buildings, and to provide a human scale and pleasant pedestrian experience.
6)
7)
8)
Entries Objective: To establish the visual impi)rtance of the primary street entrance, and to
ensure that entries contribute 'to the visual attractiveness of the building and are readily visible.
For residential buildings, primary building entrances should face the primary abutting public
street or walkway, or be linked to that street by a clearly defined and visible walkway or
courtyard. Additional secondary entrances may be oriented to a secondary street or parking
area. Porches, steps, pent roofs, roof overhangs, hooded front doors or similar architectural
elements should be used define the primary entrances to all residents.
· The condominiums meet the objectives.
· The townhomes meet the objectives.
Rear Faqade and Entries Objective: To improve the appearance of rear fagades, orient
customers parking or walking to the rear of buildings, and provide safe and convenient access to
all building entrances.
· Each of the facades of the condominium buildings and townhomes will be designed to the
same high standard and meet this requirement.
Building Materials Objective: To ensure that high-quality, durable and authentic building
materials are used in residential and nonresidential construction. All buildings should be
constructed of high-quality materials, including the following: brick; natural stone; precast
concrete units and concrete block, provided that the surfaces are molded, serrated or treated with
a textured mater/al in order to give the wall surface a three-dimensional character; stucco; jumbo
brick may be used on up to 30 percent of any faqade, provided that it is used only on the lower
third of the building wall; wood, consisting of horizontal lap siding with an exposure no greater
than 5 inches or wood shakes (surfaces must be painted); synthetic wood (fiber cement) siding
resembling horizontal lap siding.
· The condominiums will be constructed of brick, stucco and siding. According to the
Developer, the condominium exterior materials will be approximately 20 percent brick with
two different colors, 20 percent stucco and about 60% acceptable siding materials. Final
building plans shall be subject to the review and approval of the City Staff to ensure that
the building materials and design meet the requirements of the Urban Design Guidelines for
the Highw. ay District.
· The townhomes will be constructed of stucco with stone veneer and decorative half
timbers. They will complement the materials used on the condominium buildings. Final
building plans shall be subject to the review and approval of the City Staff to ensure that
the building materials and design meet the requirements of the Urban Design Guidelines for
the Highway District.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 9
9)
10)
Rooftop Equipment Objective: To ensure that views of rooftop equipment fi.om public streets or
pedestrian ways are minimized. All rooftop equipment shall be screened from view from
adjacent streets, public rights-of-way and adjacent properties. Preferably, rooftop equipment
should be screened by the building parapet, or should be located out of view from the ground.
· According to the Developer, rooftop equipment will be designed in accordance with this
requirement. Final building plans for the condominium and townhouse buildings shall be
subject to the review and approval of the City Staffto confirm that this requirement is met.
Building Colors Objective: To ensure that building colors are aesthetically pleasing and
compatible with their surroundings. Building colors should accent, blend with, or complement
surroundings. Principal building colors should consist of subtle, neutral or muted colors with
low reflectance. Warm-toned'colors are encouraged. No more than two principal colors may be
used on a fagade. Bright or primary colors should be used only as accents, occupying a
maximum of 15 percent of building facades.
· The condominiums meet this requirement.
· The townhomes meet this requirement.
11)
Architectural Detailing Objective: To encourage new building design that echoes the design of
the few iconic buildings that remain in Columbia Heights - notably the Heighis Theater - while
enlivening building facades and contributing to a human-scaled environment. Architectural
details such as ornamental cornices, arched windows and warm-toned brick with bands of
contrasting color are encouraged in new construction. The contemporary adaptation of historic
and vernacular residential, institutional and commercial styles found in Columbia Heights and in
Northeast Minneapolis is encouraged.
· The condominium buildings meet this requirement.
· The townhomes meet this requirement.
Site Design Guidelines
12) Parking Location Objective:
13)
14)
To improve the appearance and convenience of parking lot
circulation for vehicles and pedestrians by breaking the parking area up into smaller units.
· Parking for the condominiums is provided in underground garages and parking for the
townhomes is provided in two-car garages. Visitor parking is located along the privately-
maintained roadway, in accordance with these requirements.
Parking Area Screening Objective: To soften the appearance of parking areas when viewed
from an abutting street or sidewalk and to screen parking areas from residential yards.
· The landscape plan for the development illustrates that these requirements are met.
Structured Parking Objective: To ensure that parking structures are compatible with
surrounding buildings and make a positive contribution to the streetscape. Entrance drives to
structured parking (including underground parking) should be located and designed to minimize
interference with pedestrian movement. Pedestrian walks should be continued across driveways.
The underground condominium parking garages will project out between 1 to 4 feet above
ground according to the site topography. According to the Developer, these will be
architecturally designed to match the Highway District Design Guidelines.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 10
15)
Placement and Screening of Service, Loading and Storage Areas Objective: To screen views of
service and loading areas, and to ensure that the noise impacts of these functions are fully
contained and not audible from surrounding streets and properties. Screening must be provided
in accordance with the Zoning Ordinance.
· The landscape plan for the development illustrates that these requirements are met.
16) Pedestrian and Bicycle Access Objective: To ensure that pedestrians and bicyclists have safe
and convenient access to all business establishments to all business establishments.
· The proposed development includes a sidewalk and trail network throughout the site. 'This
includes trails around ponds with open space areas, along the edges of the condominium
buildings and surrounding the interior edge of the development. When Outlot C is
developed in a later phase, the internal' sidewalk on the 47th Avenue side of the
development will be eXtended to Central Avenue. Additionally, staff encourages the
extension of the sidewalk east toward Fillmore. The development also includes a sidewalk
connection to the 49th Avenue right-of-way.
· A completion of a link should be provided from the interior trail system on Outlot B west
toward the public roadway. A link currently exists to the gazebo, and then from the gazebo
to the pool. A link should also extend around the outside edge of the pool west to the
roadway.
17) Signs Objective: Signs should be architecturally compatible with the style, composition,
materials, colors and details of the buildings and with other signs on nearby buildings. Signs
should be an integral part of the building design.
· According to the Developer, there will a monument sign for the project. Detailed plans
for the sign must be submitted to City Staff for review and approval to confirm that the sign
meets the Design Guidelines prior to final plat approval.
18)
Lighting Objective: To ensure that safe and attractive lighting levels are provided around all
buildings and parking areas, without excessive glare or brightness. Exterior lighting should be
the minimum necessary for safety and security. Lighting should be designed to coordinate with
building architecture and landscaping. Building mounted fixtures compatible with building
faqades are encouraged.
· The Developer has submitted a site lighting plan showing the location of site lighting.
· Lighting fixtures must be reviewed and approved by City Staff to ensure conformance
with Design Guidelines, prior to final plat approval.
· The Developer'must submit a lighting spread pattern map to the City Engineer for review
and approval that shows boarder illumination not to exceed the maximum allowable foot
candles at the property line, prior to final plat approval.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 11
Kmart Redevelopment Concept Plan
The Grand Central Lofts Site Plan has been designed in accordance with the goals and objectives of
the Kmart Redevelopment Concept Plan developed by the Kmart Advisory Group under the guidance
of the City Council. In May 2003, the City of Columbia Heights initiated a planning process for the
Kmart Site for the purpose of creating a redevelopment plan for the outdated and mostly vacant retail
center. Goals of the plan include more employment opportunities witkin the City, new housing
option previously not available in the City, increased opportunities for transit use, amenities to
promote walking and biking, and improving the image and vitality of Central Avenue. A City
Council-established citizen advisory group and the Developer worked closely to create the Concept
Plan to meet the needs of both the community and the'Developer.
Residential Goal
The Grand Central Lofts site plan meets the stated goal for residential development, which is to
"provide the City of Columbia Heights a variety of housing types, styles and choices to meet the
needs of the community. The main objectives for the residential development include:
Provide a diversity of housing choices that will satisfy customer preferences for'this location
SUpport appropriate urban housing densities along with performance standards to create financial
value and achieve strong purchasing power to support neighborhood service businesses.
Promote a redevelopment concept that creates an attractive urban neighborhood that includes
housing amenities such as decks, open spaces, gathering areas, recreational amenities, pedestrian
ways, landscaping and green spaces to ensure a safe functional and desirable living environment.
Successfully integrate the new neighborhood into the surrounding older established
neighborhoods.
Require high quality community design and construction standards."
Parks, Open Spaces and Natural Environment Goal
The Grand Central Lofts site plan meets the intent of the stated goal for open space, being that the
redevelopment "will include a neighborhood park that will act as the focal point for the neighborhood
and provide an amenity to the surrounding community. A series of trails and landscaped boulevards
will connect the park to the elements within the development and to the adjacent neighborhoods. A
stairway connection will also be provided from the development up to 47th Avenue to provide access
to the adjacent neighborhoods. The existing slope along the eastern edge of the site will be enhanced
with terraced walls, native landscape materials and stormwater enhancements. Other sloped areas
throughout the development will receive the same type of treatments."
The concept plan suggested that the location of the open space extend westward to abut the Central
Avenue commercia! development. This created a view and connection from Central Avenue into the
open space. The Grand Central lofts, site plan provides ponding and the community center site
adjacent to the new right of way, east of the commercial development, limiting the view of the
interior open space from Central Avenue. Consideration should be given as to how the view and
connection from Central Avenue to the open space may be enhanced.
PLANNiNG & ZONiNG MINUTES
OCTOBER 28, 2003
PAGE 12
Therefore, it is the recommendation of staff and the task force to approve the Preliminary Plat as it is
found to meet the following Findings of Fact established in Section 9.411 (6) of the Zoning
Ordinance for Preliminary Plats.
1. The proposed Preliminary Plat conforms to the requirements of the Subdivision Ordinance.
2. The proposed subdivision is consistent with the Comprehensive Plan.
o
The proposed subdivision contains parcel and !and subdivision layout that is consistent with
good planning and site engineering design principles.
Site Plan
Staff also recommends approval of the Site Plan as it also meets the following Findings of Fact
established in Section 9.413 of the Zoning Ordinance for Site Plan Review.
1. The Site Plan conforms to all applicable requirements of this Ordinance.
2. The Site Plan is consistent with the applicable provisions of the City's Comprehensive Plan.
The Site Plan is consistent with the applicable area plan. The Site Plan has been designed in
accordance with the goals, objectives and concept plan of the Kmart Site Redevelopment
Concept Plan.
The Site Plan minimizes any adverse impacts on property in the immediate vicinity and the
public fight-of-way.
At this time Commission Chair Yehle opened up the Public Hearing. He reminded residents that no
one is guaranteed a view forever. He listed several examples around Columbia Heights and
Minneapolis of views that have changed due to re-development.
Kevin Doty of 1845 Fairway Dr. asked who would be responsible for infra-structure improvements
such as water and sewer. He also questioned plans for rain water/storm water runoff and whether any
of the new housing will be used for Section 8 purposes. Kevin Hansen, Public Works Director
answered his questions. He told him it is the responsibility of the developer to pay for the
infrastructure changes and improvements for the project. And these residential units are not for
Section 8 housing. They will be sold in the range of $170,000 to $330,000 and are geared to be
owner-occupied.
Ken Myhre of 1141 Cheery Lane has lived there since 1990. His concern was his nice view being
taken away and he feels the present owners in the neighborhood shouldn't be ignored. He was shown
projected views that were taken from three points in Cheery Heights. After seeing what the view is
projected to look like, he thought the plans were acceptable.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 13
John Kalata of 1144 Khyber Lane said the height of the proposed construction was lowered from 52
feet to 43 feet. He thinks that was a nice compromise and acceptable. He is pleased with the
cooperation shown by the developer to accommodate some of the concerns of area residents. It was
also explained that a retaining wall and a double row of trees will be placed along the east side of the
development to buffer the new units from the Cheery Heights Neighborhood.
John Feges fi-om Nedegaard Homes explained the placement of the sidewalks and how they will tie
into those on 49th Avenue.
Pastor Bob Lyndes said he is in favor of the development. He said it will bring people to this
community, add to our property' tax revenue, increase school revenues, and be an asset to the
community as a whole.
Keith Dreyer of 1041 49th Avenue is concerned about the added traffic on 49th Ave with the opening
of the new road. He believes the traffic count is already too high on that street. Kevin Hansen
reported that a traffic study had been done in August and it was adjusted for seasonal changes such as
school being in session. The study showed that it wouldn't create problems except possibly during
the morning school rush. The sight distances coming in and out of the proposed street location were
designated as good. He said the study indicated approximately 900 vehicles per day would be added
to the current traffic count of 5400 on 49th Ave with the new development. He said the traffic count
on Central Avenue is approximately 28,000 ,Pther d,ar~Y, and that MN DOT is currently doing a timing
study of the lights on Central Avenue fi.om 40 - 53 and that the timing of the lights may be changed
to help traffic flow.
Commission member Baker asked about the big hill behind K-Mart and how it would be stabilized.
Kevin Hansen explained that the storm water currently drains to the north to 49th Avenue and is not
directed down the hill. He said Engineered plans will be submitted and reviewed as part of the
development building review process for any ietaining wall or erosion control due to the change of
elevations between this property and the existing neighborhood to the east.
Kevin Hansen was asked about the existing watermain and whether it could be re-used. He said if it
is in good condition, they would have the right to do so.
Bruce Nawrocki of 1255 Polk Place asked whether the developer would be responsible for the
expense of putting the new road in to 49th Avenue. He was told, yes. Mr. Nawrocki also wanted to
make sure the conditions of approval were read to those in attendance for the record.
Schmitt asked about the ponds that will be created. She wanted to know if they were going to have
water in them at all times or just used for storm water. She was told they would hold water all the
time, but the level..would go up due to storm water running into those ponding areas fi-om time to
time. With that the hearing was closed.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 14
Preliminary Plat
Motion by Peterson, seconded by Szurek to recommend that the City Council approve the
Preliminary Plat of Subdivision subject to the following conditions of approval that have been found
to be necessary to protect the public interest and ensure compliance with the provisions of the Zoning
and Development Ordinance, including:
1. An approved Preliminary Plat shall be valid for a period of one year from the date of City
Council approval. In the event that a final plat is not submitted within this time period, the
Preliminary Plat will become void.
2. The proposed land swaps shown on the preliminary plat concerning the properties located at
4811 and 4849 Central Avenue must be completed and reflected on the final plat prior to
final plat approval. · '
3. The Developer must obtain the approval of Anoka County on the 49th Avenue access prior to
approval of final plat.
4. The Developer must submit plans to MnDOT for review and recommendation prior to
approval of final plat.
5. The public roadway curbing should be a B618 design.
6. The City's requirement for intersection clear zone or a 30-foot triangle must be maintained at
the public road access on 49th and 47th Avenues.
7. The Developer must make a park dedication contribution in the amount of $163,5OO prior to
approval of the final plat.
8. If stormwater is to be conveyed off site following the same discharge route as it currently
follows, the preliminary plat must include a utility easement. This utility easement must be
added to the preliminary plat prior to review of the preliminary plat by the City Council.
9. Data on the public road curve should be included on the preliminary plat prior to review of
the preliminary plat by the City Council.
10. The written legal description on the preliminary plat should be reviewed as the distances
do not match what is shown on the drawing· The legal description must be corrected prior
to review of the preliminary plat by the City Council.
11. The Developer must explain why there is a change in the public road right-of-way width
from 50' to 55' and back to 50' to the satisfaction of the City Engineer or revise the right of
way width per the direction of the City Engineer prior to review of the preliminary plat by
the City Council·
12. A storm water management plan, meeting the requirements of City Code Section 9. 609 will
be required prior to final plat approval.
13. Catchment area maps and stormwater water calculations must be submitted and approved
prior to final plat approval.
14. The proposed surface water ponding plan generally meets the minimum requirements for
the I O0-year storm event. Please provide supporting documentation for the WRMP policy
of "new development shall incorporate storm water controls to prevent any increase in
Peak discharge rates, "for the critical storm event.
15. The existing K-Mart property drains through a CMP storm line into Central Avenue,
through private property. The condition of the line requires replacement to Central.
16. A detailed erosion control Plan should be prepared and submitted with the final plans.
17. If the project is going to be phased, the erosion control plan should be representative of the
phasing plan.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28,2 003
PAGE 15
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
All Ayes.
A site gradingplan will be requiredprior tofinalplat approval If the site will not be mass
graded, a phasing plan should be included.
If the proposed retaining wall exceeds four feet in height, the final plans should include a
wall design by a registered engineer.
Any site grading prior to final plat approval will require an excavation permit, obtained
from the Engineering department.
The Developer must address how will the steep slopes on the entire east side, part of the
south and bordering the westerly commercial property will be restored and maintained
with the submittal of the final plat.
An NPDES permit will be required.
AH public utilities shah meet the City of Columbia Heights specifications.
AH utility work shah be consistent with the City of Columbia Heights specifications, at a
minimum.
The plans should indicate what existing watermain will be utilized and what main will be
abandoned. The method of abandonment (or removaO should also be indicated.
AH public watermain should be minimum 8 inch in diameter.
Include adequate valving for water main isolation.
The Development shaH provide the City of Columbia Heights with as-built drawings of all
newly constructed utilities.
The Homeowners Association covenants will be submitted to the City Attorney and City
Engineer for review and approval prior to final plat approval.
Afire hydrant should be located on the' south side of Outlot A.
MOTION PASSED.
Site Plan
Motion by Yehle, seconded by Peterson to approve the application for Site Plan, including the design
of the condominium buildings, based on the Findings of Fact and subject to the following conditions
of approval that have been found to be necessary ensure compliance with the requirements of the
Zoning and Development Ordinance:
1. The approval of a Site Plan by the Planning Commission shah be valid for a period of one
year. ,
2. Final building plans for the condominium and townhouse buildings shah be subject to the
review and approval of the City Staff to ensure that the building design meets the
requirements of the Urban Design Guidelines for the Highway District, prior to issuance of
any building permits.
3. AH outstanding items listed under Highway District Urban Design Guidelines on pages 5-
9 of this report must be submitted to City Staff
4. Detailed plans for the monument sign must be submitted to City Staff.for review and
approval to confirm that the sign meets the Design Guidelines prior to final plat approval.
5. Lighting fixtures must be reviewed and approved by City Staff.to ensure conformance with
Design Guidelines, prior to final plat approval.
6. The Developer must submit a lighting spread pattern map to the City Engineer for review
and approval that shows boarder illumination not to exceed the maximum allowable foot
candles at the property line, prior to finalplat approval.
7. The Developer must work with City Staff.and the Fire Department to assure that the Site
Plan provides adequate building access and circulation for emergency vehicles, prior to
final plat approval.
All ayes. MOTION PASSED.
PLANNING & ZONING COMMISSION MINUTES
OCTOBER 28, 2003
PAGE 16
NEW BUSINESS
None
MISCELLANEOUS
Yehle reminded members of the joint Holiday Dinner that will be held December 10 at Murzyn Hall
to honor those who volunteer their time on various boards and commissions.
He also reminded members of the regular meeting on Tuesday, November 4, 2003 at 7 pm when
plans will be reviewed for Heights Rental Center that will be located on 51st Court.
Motion by Baker, seconded by Schmitt to adjourn the meeting at 8.'30pm. All ayes.
MOTION PASSED.
Respectfully submitted,
Shelley H~s~o~ ~~
Secretary