Loading...
HomeMy WebLinkAboutOperational Report from Joanne To: M. Rebecca Loader, Library Director From: Joanne Peterson, Library Clerk Subject: December Operational Report Date: December 30, 2004 I COLLECTION PROJECTS Paperback Order A . Two online orders were typed and sent. Paperbacks have been received and processed. Withdrawn Items. B Items were withdrawn from the system and recycled. Videos were withdrawn and recycled Reference. C Began a review of items in the reference section to make sure the collection is in order and up to date. Magazines. D Magazine labels were typed. II TRAINING Page Training. A Reviewed training manual in preparation for January page training. III MAINTENANCE PROJECTS Fire Extinguishers. AGauges were checked on December 17, 2004. Security Gates. B Filters were cleaned on December 17, 2004. Air Fresheners C. . Changed on December 29, 2004. Emergency Lights and Signs D. . Heights Electric performed annual maintenance and replaced an EXIT sign in the lower level. IV MISCELLANEOUS Shelf-Reading Assignments. AJanuary shelf-reading was assigned and posted. ILL Drawer/Notebook. BBoth items were maintained. Paperback Display. C. Display featuring Minnesota authors and/or locations was set up and maintained. Internet Use. D Set up a program to track use and fines owed by users. .