HomeMy WebLinkAboutOperational Report from Joanne
To: M. Rebecca Loader, Library Director
From: Joanne Peterson, Library Clerk
Subject: December 2004 Operational Report
Date: December 30, 2004
I COLLECTION PROJECTS
Paperback Order
A . Two online orders were typed and sent. Books were checked
in and marked for processing.
Withdrawn Items.
B Items were withdrawn from the system and recycled. Videos
were withdrawn and recycled.
Magazines.
C Magazine labels were typed.
Paperback Display.
D Display featuring Minnesota authors and/or locations was
set up and maintained.
Reference.
E Began a review of items in the reference section to make sure the
collection is in order and up to date.
II MAINTENANCE PROJECTS
AFire Extinguishers
. Gauges were checked on December 17, 2004.
Security Gates.
B Filters were cleaned on December 17, 2004.
Air Fresheners
C . Changed on December 29, 2004.
Emergency Lights and Signs.
D. Heights Electric performed annual maintenance
and replaced an EXIT sign in the lower level .
III MISCELLANEOUS
Shelf Reading Assignments
A . January shelf reading was assigned and posted.
ILL Drawer/Notebook
B . Both items were maintained.
.
Display featuring Minnesota authors and/or locations was set up and maintained.