Loading...
HomeMy WebLinkAboutOperational Report from Joanne To: M. Rebecca Loader, Library Director From: Joanne Peterson, Library Clerk Subject: December 2004 Operational Report Date: December 30, 2004 I COLLECTION PROJECTS Paperback Order A . Two online orders were typed and sent. Books were checked in and marked for processing. Withdrawn Items. B Items were withdrawn from the system and recycled. Videos were withdrawn and recycled. Magazines. C Magazine labels were typed. Paperback Display. D Display featuring Minnesota authors and/or locations was set up and maintained. Reference. E Began a review of items in the reference section to make sure the collection is in order and up to date. II MAINTENANCE PROJECTS AFire Extinguishers . Gauges were checked on December 17, 2004. Security Gates. B Filters were cleaned on December 17, 2004. Air Fresheners C . Changed on December 29, 2004. Emergency Lights and Signs. D. Heights Electric performed annual maintenance and replaced an EXIT sign in the lower level . III MISCELLANEOUS Shelf Reading Assignments A . January shelf reading was assigned and posted. ILL Drawer/Notebook B . Both items were maintained. . Display featuring Minnesota authors and/or locations was set up and maintained.