Loading...
HomeMy WebLinkAboutOperational Report from Becky CITY OF COLUMBIA HEIGHTS TO: Columbia Heights Public Library Board of Trustees FROM: M. Rebecca Loader, Library Director SUBJECT: February operational report DATE: February 27,2004 I. BUILDING MAINTENANCE A. The windows were cleaned 2/11. B. Honeywell performed routine maintenance on the HV AC 2/13. C. Orkin performed routine maintenance 2/18 and checked on the grease-ant problem in the basement. II. COLLECTION A. The bindery picked up and delivered items 2/4. B. Adult paperbacks were ordered. C. Three large book orders were placed and received during the month. III. EQUIPMENT A. No changes. IV. PROGRAMS A. The Friends cancelled their February meeting. B. The Board met 2/3 with five members present. C. Eights sessions of preschool storytime were held during the month. D. The bulk loan to the high rises was delivered 2/4. E. ICS classes visited the Library during their regularly scheduled times the week of 2/9. F. Marsha spoke to a class at the Family Center 2/12 on the importance of reading to preschool children. G. Becky attended the Library Foundation Meeting 2/18. The June fundraiser preparations are proceeding on schedule. R. The bulk loan was delivered to the schools 2/26. I. The Adult Reading Program, "Hot Reads for Cold Nights", ended 2/28. V. AUTOMATED CIRCULATION SYSTEM A. No changes. VI. STAFF A. Marsha attended summer teen program meetings 2/5 and 2/12. B. Becky attended an ILS (Integrated Library System) meeting 2/11. This project is moving along according to schedule so that the ACS will be replaced in 2004. C. Becky attended Technology Plan Meetings 2/12 and 2/19. The Plan is due to MELSA by 3/1 for submission to the State by 4/26. Certification of the Plan qualifies the Library for RL T A (Regional Library Telecommunications Aid) funds and E- Rate. D. Marsha attended a MELSA workshop on the Summer Reading Club 2/24. E. Jeanine participated in a cable shoot 2/25. F. Ramon Gomez and Stephanie Bengtson reached their 24-months anniversaries as Library Pages. VII. MISC A. A MELSA crossover use survey was conducted 2/10. B. Bob Streetar has arranged for a sign that used to hang in the entryway of the old high school to be housed at the Library. The sign was delivered 2/13. C. The Library's 2003 Annual Report was submitted 2/18. D. Major projects in progress: a. Performance reviews. b. Technology Plans (ACL and CHPL) revisions. c. Foundation Fundraiser. d. Staff recruitment, interviewing, and training. VIII CIRCULA TION AND LIBGIS JANUARY Circulation 2003 2004 Libgis 2003 2004 Adult 5,429 5,650 Reference 1,354 1,201 Juvenile 4.487 4,975 Dir. A. 571 650 9,916 10,625 Dir. B. 69 40 Work Days 25 25 Work Days 25 25 Circulation Building JANUARY 2003 JANUARY 2004 8,963 9,103 IX GA TE COUNT AND MEETING ROOM USE JANUARY Gatecount 7,252 Meeting Room Use 11 X INTERNET BROWSER USE JANUARY 2003 368 JANUARY 2004 454 MRL/jms