Loading...
HomeMy WebLinkAboutOperational Report from ShariTo: Becky From: Shari Date: March 29, 2000 Re: Operational Report for March Projects: 1. Painting the activity room. Misc. A. B. C. D. ! arranged to have the activity room painted by R.W. Ceilings and Walls on March 17th. They were able to complete the job in one day but it did require two coats of paint to cover the old peach paint. ! submitted a second PO for the additional cost. Floor cleaning. Fidelity Cleaners was scheduled to come in and strip and wax the activity room floor and the kitchen floor. They were also to strip and clean the restroom floors. ! moved much of the furniture out of the activity room prior to the cleaning. The activity room floor required two nights to complete but it looks wonderful. The kitchen floor looks nice also. The restroom floors look much better now that they have been stripped and cleaned. ! was impressed with the work done and passed that on to Pam from Fidelity. Ready Reference. ! am continuing to work on the ready reference files. ! have decided to do a first pass through to verify the titles in the database and discard the cards that are no longer valid. Then ! plan to go back through and match up the cards with the files and update information as needed. Book sale donations. ! took some time to re-pack the donations we have received. Someone had dropped off several bags and boxes of books and they were cluttering up the storeroom. ! have tried to pack the donations in boxes as they come in so that they can be stacked up in the corner out of the way. Kindergarten Roundup. ! will be attending the Kindergarten Roundup at Highland Elementary on Thursday, March 30. My goal is to make the parents aware of the library and to get their children signed up for library cards. ! will be handing out applications as well as several flyers on reading lists, children's services, upcoming programs, etc. ! will include a brief report on this evening in my April operational report. Fire extinguishers. ! have been in contact with Dana Alexon at the Fire Department in regards to having our fire extinguishers serviced this month. He gave me the name and number of the new company that would be coming out and ! was able to schedule a time with Pete Ludwig from Triangle Fire Extinguishers. We had 2 extinguishers that were 12 years old or older and thus needed to be replaced. We are holding on to these two for training purposes this summer. He also recharged one extinguisher. The fire department will be sending me the bill. Paperback weeding and mending. ! have started going through the adult paperbacks to weed out the old and/or damaged books. ! am also pulling the books that just need some minor mending. Graffiti in the men' s restroom. ! was informed of some new graffiti in the men' s restroom on the main floor and took some time to cover it with paint. Bills and bill lists were prepared as needed. Magazine labels were typed twice a week. Shelf reading list for April was assigned. System maintenance was completed for the month.