HomeMy WebLinkAboutFebruary 20, 2001 Work SessionCITY OF COLUMBIA HEIGHTS
590 40TH AVENUE N.E., COLUMBIA HEIGHTS, MN 55421-3878 (612) 782-2800 TDD 782-2806
Please note: City Hall Phone Numbers have changed. New numbers are: Main Number (763) 706-3600; TDD (763) 706-3692
ADMINISTRATION
NOTICE OF COUNCIL WORK SESSION
Notice is hereby given that a work session
is to be held in the
CITY OF COLUMBIA HEIGHTS
as follows:
Mayor
Gary L. Peterson
Councilmembers
Marlaine Szurek
Julienne Wyckoff
Bruce NawrocM
Robert A. Williams
CHy Manager
Walt Fehst
Meeting of:
Date of Meeting:
Time of Meeting:
Location of Meeting:
Purpose of Meeting:
COLUMBIA HEIGHTS CITY COUNCIL
TUESDAY, FEBRUARY 20, 2001
5:00 P.M. - 6:30 P.M.
CONFERENCE ROOM 1
WORK SESSION
.4 GENDA
Discussion Items
1. Central Avenue improvement project review
2. Fire PERA Consolidated Retirement Plan funds
The City of Columbia Heights does not discriminate on the basis of disability in the admission or access to, or treatment or
employment in, its services, programs, or activities. Upon request, accommodation will be provided to allow individuals with
disabilities to participate in all City of Columbia Heights' services, programs, and activities. Auxiliary aids for handicapped
persons are available upon request when the request is made at least 96 hours in advance. Please call the City Council Secretary
at 706-3611, to make arrangements. (TDD/706-3692 for deaf or hearing impaired only)
THE CITY OF COLUMBIA HEIGHTS DOES NOT DISCRIMINATE ON THE BASIS Of DISABILITY IN EMPLOYMENT OR THE pROVIBION OF SERVICES
EQUAL OPPORTUNITY EMPLOYER
City of Columbia Heights
Public Works Department
Work Session Discussion Item:
Work Session Date: February 20, 2001 \.L~ ,t.L~'
Prepared by: Kevin Hansen, Director of Public Work
Item: Feasibility Report for Water Services and Streetscaping
Project 9912-A
Background:
On January 22, 2001 the City Council adopted a resolution ordering the preparation of a
feasibility report for Central Avenue water Services and Streetscaping. The Council has
previously accepted a feasibility report for Street and Utility Improvements at its regular
meeting on December 13, 1999. That report included utilities: sanitary sewer, storm
sewer and water main and street reconstruction which includes center medians, concrete
curb and gutter, bituminous pavement and concrete sidewalk.
Analysis/Conclusions:
Attached is a feasibility report for two improvement types that have identified
assessments as part of their funding sources: Water services and streetscaping.
Water services
Water services are proposed to be replaced within the project area from 37th to 43r~
Avenues. Sizing will be replaced in-kind, but with a minimum service size of 1 inch,
consistent with City Code. The services would be replaced from the new main line to the
property line and include: a wet tap with corporation valve, copper or DIP service line
and curb stop at the property line. Assessments are proposed for actual construction cost
for all commercial/multi-family property and flat rates of $900 and $1,500 for single
family properties on the west and east sides of Central, respectively.
Streetscaoin~
Strcctscaping has bccn designed following thc general themes identified in the
Downtown Master Plan and includes decorative street lighting, colored and banded
concrete sidewalks, new trees and grates and other amenities such as color and material
coordinated planters, trash receptacles and benches. Thc concrete color is typically
selected after contract award based upon actual mixes poured in the field as samples.
Trec locations may need further adjustment in thc field based upon fronting property
input and visibility needs.
Proposed Assessments
Water services: Water services are proposed to be based on actual construction cost for
the size of service replaced. Single family residential properties are proposed at $900 for
1 inch for the west side of Central and $1,500 for the east side of Central.
Work Session Item:
Feasibility Report for Water Services & Streetscaping
February 20, 2001
Page 2
Streetscaping: Streetscaping is proposed to be assessed on a front foot basis for all
property on both sides of Central from 37th to 434 Avenues, excluding single-family
parcels. Two rate zones have been established: a higher rate for the 'core' downtown
area from 39th to 41st Avenues where the treatments will be more intense; and a lower
rate from 37th to 39th and 41st to 43~d Avenues as the treatments are less intense. The
amount proposed to be assessed is indicated as one of'three alternatives: 25%, 33%, and
50% of the total project costs. A different preliminary assessment roll is attached showing
the rates and proposed assessments to each property based on the three alternatives.
Other Issues:
City staffand the consulting finn of BRW will be in attendance to discuss other issues
such as:
· Reservoir Boulevard design
· 37th Avenue intersection operation
· Other median openings
· Parking during construction
· Access to business during construction
· Metro Transit issues
· Coordination with the City of Minneapolis
· Project schedule
Requested Action:
1. Accept Feasibility Report and set April 16, 2000 for a Public Improvement Hearing
2. Consider Streetscaping Assessment percentages for notice in Improvement Hearing
Attachment: Feasibility Report
CITY COUNCIL LETTER
MEETING OF: FEBRUARY 26, 2001
AGENDA SECTION: CONSENT ORIGINATING DEPT: CITY MANAGER
NO: FINANCE APPROVAL
ITEM: INTERPRETATION OF VARIOUS BY: W ILLIA~I£LRITE BYx.' /.//~/,~ /
CHARTER PROVISIONS IN RELATIONSHIP TO
THE PURCHASE OF AN SUV FOR THE FIRE DATE: 02/I5/2001
DEPARTMENT
NO:
At the City Council meeting of November 27, 2000 the City Council adopted Resolution 2000-82 being a
resolution establishing restrictive accounts for excess fire pension residual assets and adopting a plan for
the expenditure of such assets. In essence, this resolution was required by the State of Minnesota in order
to have excess funding in the Fire Consolidated PERA account returned to the city. In addition to this,
council authorized the mayor and city manager to enter into an agreement for the purchase of a 2001 Ford
Expedition under state consortium bid for a total of $46,254. This is being brought back to the council for
review in relationship to various charter provisions governing purchases and appropriation of funds.
A question was raised regarding the authority of the City Council to authorize the purchase of the SUV
prior to actually receiving the funds for the purchase. In my review of the charter, I have found that
Section 56 through Section 65 possibly relates to this issue in relationship to purchases and modifications
in the budget. These sections have been reviewed with the city attorney and it is his opinion that the
action taken by the council in November does authorize the purchase of the SUV with no further action
required by the City Council. This item is being brought back to the council for discussion and review in
relationship to the charter provisions and to determine if the City Council wants the approval of the SUV
placed on a future council agenda.
RECOMMENDED MOTION: Move to affirm that the action taken by the City Council on November 27,
2000 in relationship to the purchase of an SUV for the Fire Department was in compliance with City
Charter provisions and no further action is required.
ALTERNATE MOTION: Move to direct staffto bring the issue of purchasing an SUV for the Fire
Department back to the City Council for further review as the action taken at the November 27, 2000
council meeting authorizing the purchase was not in accordance with City Charter provisions.
WE:sms
0102151COUNCIL
ARachment
COUNCIL ACTION:
Section S8. PUBOHASBS d~D ~OHTIACTS. The city uonadsr shall be thief
parchasin8 about of the city. AIl perth·ess and contracts ou behalf of tho
council vhanovor thc nausea of ouch parch·sss er contracts eanoeds $3,000.00.
All cuntrects of ouy k~d to vhlch tho city lo · party ezeoedin8 tS.000 nd
Inatruovnts for b conveyance of ny riel ant·ts by the city shall be el·ned
by the myer nd the city User ou behlf of the city end obll be ass·uSed
In the me of the city.
Section' S?. ~FflACTSo BeV LET. ALl cuntrecta ·f the city ob·Il be let In
accordance vlth the Unlforu ~uninlpal Caner·caInS l~v of the Stets of
HI. acosta, hrther resulatLuns for the takinS of bids and ltttin$ of contracts
my be md. by ordmouc..
Sectlun Sa. COUHCZL TO CO8~J~L FIId~CBS. Tho council shall have full
authority over the financial afro·rs of tho city, end shell provide for the
collectlun of all revenues nd other assets, the andItinS end 8sttlsuent of
accounts, and the safskoepin8 god ~obures·ent of public Boules, and In the
exercise of · smmd dlscrstloa 8b~ll arks epproprletlun for the payuunt of all
Section $0. FISGALYEAR. The fiscal year of the city shall end each year
on the Slot day of bcsuber.
Section'60. TAXATZON. t~-cept ·1 provided In this charter, the ieueral
lays of the at·ts relatIng to taxation shall apply In thio city.
Section 61. BOARD OF I~UALIZATIOJl. The council 8hll cunstltuts · beard
of equalization and shall annually uses ·e such In the ovunl place for hold~nS
to lev.
Section SS. I~XPAIATIOI! OF TH~ BUDGET. The city BoneSet oh·Il prep·rs the
· sale·tee for the remus1 had·et. The proposed ladder shall be eoueigtout vith
Bunertlly accepted account,s· princlploe and shall contain ·stiMtes of revs-
Bus, 1tcalaed ·erin·toe of expenditures for both the e~Jrrout fiscal Tear and
the ensuIng fiscal Tear, coup·ri·uno vith the revenues oud auounts ezpanded
for the post tree OOa~lotod flaoal peers, and ouch other ~nformotlon os the
ocuncll may ~l~. At
ih~l p~s~t tho ~et Ilo~ ~tb I ~et ~lqe ~ieh ~ h~hl~ht the
~or~t F~ of the
tbe eAty ~q~ o~1 d~ ~n~.
~eetXon 63. PLI3AGE ~ TI~ B~)OET. After p~enut~n of tho hdfot,
o~noll ~ ~ld met~o ~ ~ ~ t~ ~ ~MM~ tho rotates ~n~
~. frlo~ to ~tlon of the b~et ~o ~ll o~1 d~Mto
~t7 to ~ub~on ~ mat on ~o ~et ~t~tm. ~o ~ buret
r~a~3~ q~ upon o~ll bo ~t~ b7 ~o~t~on of the ~M~3
oo~tttuto t f~olal pl~ fo~ tho alt7 ~ tho oMu~ f~ PO~,
~ta3 ~e~ ~p~pr~t~ ~ the ~et ~t~ ~11 Mt ~o~ the
~t~t~ ~ve~u avaihble ~ v~B ~u. ~e o~1 ~1 ad~t the
budget f~olut~on for the ~ f~al ~ ~t h~ ~ b l~h d~ of
~t~er or ouoh other date as ~ be f~ by o~te law.
~ectlon 6~. ~ORCB4EHT ~ THE ~GFF. The airy Banqer nhall ntrlotly
onFo~oe the budget. No ezpondltur~o Bay bo Badn un·asa ouff/olant runde have
been budgeted the~'e~Por~. A~y oblJ4atlon8 lJJouPr*d by ~ person J~ the o~loy
of the o~t~ For any porpooo not mthor~/4d or for any amount to~ uhloh no money
exiots e~tktn the p~oper rued shall be n personal obLl~atAon upon the pereon
inou~r~n~ the expenditure.
Sootlon 65. H~IFICATX~S ~1 II~ B~0rf. ~er tho ~dget abel have been
pr~mt~ to the va~o
beyond the ~t~mted rev~, ~ ~ ~al ~edpto Ihall ~e~ luoh
~timtes, an~ In that ~ ~ M M~al ~eip~. ~e om f~ In the
budget ehall be app~pr~ ~ ~ ~ of ~be f~al ye~ ~r the
~o therein dos~t~ ~ M ~. ~ ~e of b ~et, the
cmncll my at a~ t~
one ~ to ann. thor ~ ~ b~ I ~l the u~u~nt~ ~uXty, sub Jeer
to the llnXtatlo~ oont~ ~ b o~ter.
~ectlon 66. LE~ l]~ ~LLB~lTOB ~e TaTEr. Tho e~ty olerk ohall trinet
to the :c~nty auditor ~ ~t ll~r th~ ~b~ 10 or ~oh oth~ date
m~ be f~ by o~to her ~ ~et ~olutAon, ~oh oh~l l~oate the
~nt of t~o8 to bo lovA~. ~oh ~ ~11 bo ooll~t~ ~ paint the~e-
~ ~ ohll bo ~valld by P~on of ~ ~fo~ty ~ tho ~
~e am, ~r Ihall a~ ~ be ~u~ bMmle b ~nt levA~
b ~nt ~ ~ ~ ~r ~o~ ~ ~
I~A~, but ~ ~oh ~se b ~ms o~l ~ ~ b ~ ~
bel~s,
botion 67. TiT SFfTLB4DFf t~TH COUF~ TRELqURER. The oity t~oaourer
ohall uae to At that al! non,on ~n the oountl tr~atury bolon~uf to the olty
ere p~onptl, y turned over to tho oity Iooordln~ to law.
15
Meeting of: Ngv~mber 27, 2000
AGENDA SECTION: ORIGINATING DEPARTMENT: CITY MANAGER
APPROVAL
NO: Fir~
ttt~M: BY: Charl~s Thompson BY:
NO: DATE: November 20, 2000 D.A.'rE~
Ivth~nesota Law 1999 Chapter 222 emitled, "Omnil~ R~tirement Bill', Ires rns_d_e substantial changes to public
employee pensions in iMinnesoUt, includinl~ the ~ ~ of the Columbia Heishts Irsre Pension Plan. One of
these changes permits the return of the excess fundi~ from the fire consolidation amomu to the local jurisdiction.
The porgon of excess funding available for the reruns to the City of Columbia Heights is approximately $678,959.
Analsis:
Prior to receiving these funds, the city must hold a public hearing, adopt a resolution, and adopt a plan for the
funds. Tbe plan for the excess funds will be usad to assist the Fire Department in tbe fundin~ of the F~re Capital
Outlay Fund. Also, a portion of the excess funds will be used to assis~ the Fire Department in funding the purchase
ora new SUV. This vehicle will be a 2001 Ford Expedition to be purchased under the State Consortium Bid for
a total of $46,254.01, plus any applicable tax and license fees ($31,247.00 for the vehicle purcha.se and $15,007.01
for the customizalion oftbe SD'V). Vehicle will be purchased from North C~,h~d Ambulance Sales and Service,
Lester Prairie, ~ta.
RECOMMENDED MOTION: Move to waive the reading of Rnsolution g2000-82, there bein$ ample copies
available to the public;
Move to adopt Resolulion ~2000-82, a resolution establishing restrictive accounts for excess fire pension residual
nss~s and adopting a plan for the expenditure of such as,sets; and furthermore, to a~thorize the Mayor and City
lvlana~er to enter into an a~reemant for purchase of 2001 Ford Expedition under State Consortium Bid for n total
of $46,254.01, plus any applicable tax and license fees, from North Central Ambulance Sales and Service of Lests~
00-107
City of Columbia Heights
FEASIBILITY REPORT
FOR
CENTRAL AVENUE IMPROVEMENTS
Water Services and Streetscaping
CITY PROJECT 99-12a
FEBRUARY, 2001
ENGINEERING DEPARTMENT
63 7 38th Avenue NE, Columbia Heights, MN 55421
763- 706-3 700 · 763- 706-3 701 (Fax)
LOCATION:
IMPROVEMENTS:
INITATION:
OWNERS ABUTTING
And IMPACTED: 1.
2.
3.
4.
5.
CITY OF COLUMBIA HEIGHTS
CENTRAL AVENUE WATER SERVICES AND
STREETSCAPING IMPROVEMENTS
PROJECT NUMBER 1999-12a
On Central Avenue, from 37th to 43rd Avenues
Water Services and Streetscaping Improvements
City Council
37th to 39th Avenues 18
39th to 40th Avenues 23
40th to 41st Avenues 11
41st to 42nd Avenues 8
42nd to 43rd Avenues 15
2 City Parks
INTRODUCTION
And
BACKGROUND
In the spring of 1998, the City of Columbia Heights authorized the
engineering consulting finn of BRW to perfon'n a traffic study on Central
Avenue between 37th and 40th Avenues. The results of the traflSc study indicated
that traffic flow and safety would be improved by placing a raised median
through the length of the study area. Designated left tnrn lanes created in the
median would be used to eliminate left turn movements from through lanes.
In October of 1998, a request was submitted to Mn/DOT applying for
Cooperative Agreement funding for the proposed improvements to Central
Avenne. The proposed improvements identified in the Cooperative Agreement
request included construction ora center median with a consistent system of left
tm~ lanes on Central Avenue between 37th and 43ro Avenues. The request also
included costs for milling and overlaying Central Avenue in this same segment.
Additionally, thc request included the removal of all on-street parking from the
cast side and also included the removal of on-street parking from the west side,
where possible, within the project limits. At that time, the construction cost for
the proposed improvements was estimated to be $544,000.00.
In February of 1999, Mn/DOT selected the proposed project for Cooperative
Agreement funding in the amount of $540~000,00, in Fiscal Year 2001. The
Mn/DOT Fiscal Year 2001 extends l?om July 1,2000 to June 30, 2001.
An evaluation of thc existing City Utility system was conducted and the proposed
improvements now include improvements to the smfitary sewer system, water
mahl system, and storm sewer system in the project area. Streetscaping was
considered in the Fall of 2000 and added to BRW's design contract to be included
ISSUES
with the proposed street and utility improvements. A detailed description of thc
proposed street and utility improvements cml be/bund in tile Engineering Report
dated January, 2000.
Water Services
Under the original Engineering Report, the existing 6 and 8 inch water main on
the west side of the street will be replaced and upsized to a 12 inch main. This
will remove the existing lead joints and fbllow the sizing recommendations of the
1999 Water Distribution report;.
Water services are proposed to be replaced throughout the project to the right-of-
way lines. All services will be extended to the ROW line where a new curb stop
will be installed. Due to the age of most of the original installations, it is
suspected that the water services may contain lead also, or be undersized fi.om the
current City Ordinance requirement of one inch, minimum. During construction,
if service lines are found to be copper or newer Ductile Iron construction in
reasonable shape, they will be reutilized and reconnected. In these cases, the curb
stops should be inspected for condition and location and replaced, if necessary.
Landscaping/Urban Design Improvements
The City of Columbia Heights completed a Downtown Master Plan in August of
2000, which focused on a larger area that included this portion of Central Avenue.
This plan developed potential schemes for urban design and streetscaping within
the core downtown area. Because much of the planning and construction activity
for streetscaping is inter-related with the street and utility work, planning and
design work was integrated with the final street and utility plans.
The Streetscaping Improvements can be broken out into two parts: Streetlighting
and Corridor Improvements.
Streetlighting:
The streetlighting would be decorative in nature consisting of 90 street lights on
each side of Central Avenue. Fifty of these would be pedestrian light poles with a
decorative style post and lamp, such as an "Acorn" style globe. Forty of these
would be new, aluminum poles with 'Hatbox' style fixtures for intersection and
safety lighting. All electrical wiring would be placed in conduit within the
sidewalk area. Xcel Energy would install the lights based upon the City's plan
and provide maintenance of the streetlighting system.
Streetscaping Corridor Improvements:
The streetscaping corridor improvements consist of focusing on the core
downtown area from 39th - 41st Avenues, with less intense treatments north and
south of this area in the project corridor. The treatments would include colored
banding of the sidewalks; introducing a colored cross walk at 40th Avenue; grid
scoring of the center medians; tree replacement with new grates, placed in soil
matrix for root containment; coordinated benches, planters and trash receptacles.
2
Existing trees that are salvageable will be preserved, although most trees in the
corridor will be removed due to utility construction.
PROJECT
SCHEDULE
Council receives draft Feasibility Report and discusses issues February 20
Council receives final Feasibility Report and orders Public Improvement Hearing March 12
Public Informational meeting prior to Public Improvement Hearing April 5th
Public Improvement Heating and Council orders Public Improvement Project April 16th
Council Approves Plans and Specifications, Authorizes Advertisement for Bids April 9th
Bid Opening May 8
Assessment Hearing (Streetscape only) May 21
Council Awards Contract May 28
Begin Construction June 11
Construction Completed November 30
ESTIMATED
COSTS
The estimated costs for proposed Water Service and Streetscaping improvements
to Central Avenue from 37tn Avenue to 43~a Avenue are detailed below. The
total costs include a 20 percent allowance for indirect costs such as engineering,
administration and legal items as well as capitalized interest. A detailed cost
estimate sheet is included in this report for each area of the proposed
improvements.
Water Services
Estimated Construction Cost
20% Indirect Costs
Sub-Total Estimated Water Services
Urban Streetscaping
Estimated Construction Cost
20% Indirect Costs
Sub-Total Estimated Urban Streetscaping
$142,700
$28,54O
$171,240
$602,540
$120,700
$723.240
Total 99-12a Improvement Cost
$894,480
METHOD
OF
FINANCING
Cooperative Agreement fimding from MrffDOT will be used for roadway
improvements to Central Avenue and Reservoir Boulevard. Roadway
costs which exceed the amount of available Cooperative Agreement funding can
be paid for through State Aid funds.
Water main improvements are proposed to be funded through the City's Water
System Utility Fund. Sanitary sewer improvements are proposed to be funded
through the City's Sanitary Sewer Utility Fund. Storm sewer improvements are
proposed to be funded through the City's Storm Utility Fund.
The following is a summary of the proposed financing plan for the project:
Previous Engineering Report, Project 99-12:
Cooperative Agreement Fnnds
State Aid Funds
Water System Utility Fund
Sanitary Sewer Utility Fund
Stoma Water Utility
City of Minneapolis ~ t~
(1/2 .~7 Signal)
$756,000
$1,997,890
$460,000
$432,000
$120,000
$90,000
Assessable portion, Project 99-12a:
Water Services Assessments $125,400
Urban Streetscaping Assessments(25%) 5;193.950 Note 1
Total Funding $4,175,240
(1: Three alternatives are included for assessing varying percentages of the total cost of
streetscaping at 25%, 33% & 50%.)
A summary of the estimated costs and proposed financing for 3 levels of
Streetscaping percentages is shown on the attached table 'A'.
Assessments for water services are proposed at 100% of actual construction for
all non-residential properties and $900 & $1,500 for residential properties on the
west and east sides, respectively, in the corridor area. This is consistent with the
City's ordinance for maintenance of utility service lines.
The assessments for streetscaping considers the total project cost, and are
proposed at three different percentages of assessed cost: 25%, 33%, and 50%. It
also establishes a different rate for the 'core' area where the treatments are more
intense, at double the front foot rate for the areas outside of the 39th to 41st area.
SUMMARY
The proposed improvements to Central Avenue are feasible, necessary and cost
effective. Construction of a new water main and services will result in improved
hydraulics and fire flow resulting which benefit local area residents and area
businesses. It will also remove lead containing pipe from the existing system and
provide new services to the ROW. Streetscaping improvements along the
proposed project area will also benefit the fronting businesses and provide
physical public improvements consistent with the City's Downtown Master Plan
for Redevelopment.
4
Table 'A'
City of Columbia Heights
Funding Alternatives
25% Landscaping Assessment Alternative
ITEM ESTIMATED FUNDING FUNDING
COST SOURCE
WATERMAIN I$ 345,500 $ 460,000 UTILITY FUND
SANITARY SEWER'$ 360,000 $ 432,000 UTILITY FUND
STORM SEWER $ 100,000 $ 120,000 UTILITY FUND
ROADWAY $ 1,908,000 $ 1,997,890 MSA
$ 540,000 ORIG. COOP
$ 216,000 CO-OP (37TH AVE. - 43RD AVE.)
$ - ~,O-OP (43RD AVE. - 45TH AVE.) (Note 1)
$ 90,000 ~ITY OF MINNEAPOLIS (Note 2)
~/ATER SERVICES $ 142,500 $ 125,400 ~/ATER ASSESSMENTS (Note 3)
$ 2,856,000 $ 3,981,290
SOFT (20%) Engineering, Admin, Bonding $ 596,000
'TOTAL $ 3,452,000 $ 3,981,290 $ 529,290.00
URBAN DESIGN $ 602,540
SOFT (20%) Engineering, Admin, Bonding $ 120,700
TOTAL $ 723,240
$ 193,950 LANDSCAPING ASSESSMENTS (Note 4)
PROJECT TOTALS r $ 4,175,240 I $ 4,175,240 $
Note 1: MnDOT removed this segment 1/01
Note 2: Assumes 50% of construction costs plus 20% Engineering.
Note 3: Assumes full cost for Commercial and $900 & $1,500 for residential
Note 4: Assumes Frontage Assessment Method
Table 'A'
City of Columbia Heights
Funding Alternatives
33% Landscaping Assessment Alternativ~
ITEM ESTIMATED FUNDING FUNDING
COST SOURCE
WATERMAIN $ 345,500 $ 460,000 UTILITY FUND
SANITARY SEWER $ 360,000 $ 432,000 UTILITY FUND
STORM SEWER $ 100,000 $ 120,000 UTILITY FUND
ROADWAY $ 1,908,000 $ 1,951,740 MSA
$ 540,000 ORIG. COOP
$ 216,000 CO-OP (37TH AVE. - 43RD AVE.)
$ - CO-OP (43RD AVE. - 45TH AVE.) (Not~
! $ 90,000 CITY OF MINNEAPOLIS (Note 2)
~/ATER SERVICES $ 142,500 $ 125,400 WATER ASSESSMENTS (Note 3)
$ 2,856,000 $ 3,935,140
SOFT (20%) Engineering, Admin, Bondin! $ 596,000
TOTAL $ 3,452,000 $ 3,935,140 $ 483,140.00
URBAN DESIGN $ 602,540
(+20%) $ 120,700
TOTAL $ 723,240.00
$ 240,100.00 LANDSCAPING ASSESSMENTS (Note
I
PROJECT TOTALS I $ 4,'175,240 I $ 4,t75,240 $
Note 1: Assumes full Co-op Participation
Note 2: Assumes 50% of construction costa plus 20% Engineering.
Note 3: Assumes full cost for Commercial and $900 & $1,500 for residential
Note 4: Assumes Frontage Assessment Method
6
Table 'A'
City of Columbia Heights
Funding Alternatives
50% Landscaping Assessment Alternative
ITEM ESTIMATED FUNDING FUNDING
COST SOURCE
WATERMAIN $ 345,500 $ 460,000 UTILITY FUND
SANITARY SEWER $ 360,000 $ 432,000 UTILITY FUND
STORM SEWER $ 100,000 $ 120,000 UTILITY FUND
ROADWAY $ 1,908,000 $ 1,831,840 MSA
$ 540,000 ORIG. COOP
$ 216,000 CO-OP (37TH AVE. - 43RD AVE.)
$ - CO-OP (43RD AVE. - 45TH AVE.) (Note
$ 90,000 CITY OF MINNEAPOLIS (Note 2)
WATER SERVICES $ 142,,500 $ 125,400 WATER ASSESSMENTS (Note 3)
$ 2,856,000 $ 3,815,240
SOFT (20%) Engineering, Admin, Bonding $ 596,000
TOTAL $ 3,452,000 $ 3,815,240 $ 363,240.00
URBAN DESIGN $ 602,640
(+20%) $ 120,700
TOTAL ~ $ 723,240.00
$ 360,000.00 LANDSCAPING ASSESSMENTS (Note,
I
PROJECT TOTALS I $ 4,175,240 I $ 4,175,240 $
Note 1: Assumes full Co-op Participation
Note 2: Assumes 50% of construction costs plus 20% Engineering.
Note 3: Assumes full cost for Commerdal and $900 & $1,500 for residential
Note 4: Assumes Frontage Assessment Method
7
CENTRAL AVENUE IMPROVEMENT PROJECT
CITY PROJECT 9912a
No. Description
CONSTRUCTION COST ESTIMATE
WATER SERVICES AND APPURTENANCES
Unit
Unit Quantity Price Amount
1 Miscellaneous Removals
2 Abandon Water Main (4")
3 Abandon Water Service (1"-6")
4 4 Inch Gate Valve & Box
5 6 Inch Gate Valve & Box
6 4 Inch Water Main-Ductile Iron CL 52
7 6 Inch Water Main-Ductile Iron CL 52
8 1" Corporation Stop
9 2" Corporation Stop
10 1" Curb Stop & Box
11 2" Curb Stop& Box
12 1" Type K Copper Pipe
13 1" Type K Copper Pipe (Directional Bored)
14 2" Type K Copper Pipe
15 2"Type K Copper Pipe (Directional Bored)
16 Ductile Iron Fittings
17 Reconnect Water Service
LS 1 $15,850.00 $15,850.00
LF 418 $3.00 $1,254.00
EA 62 $200.00 $12,400.00
EA 9 $525.00 $4,725.00
EA 2 $650.00 $1,300.00
LF 442 $20.00 $8,840.00
LF 15 $24.00 $360.00
EA 45 $100.00 $4,500.00
EA 6 $175.00 $1,050.00
EA 45 $200.00 $9,000.00
EA 6 $250.00 $1,500.00
LF 915 $17.00 $15,555.00
LF 903 $25.00 $22,575.00
LF 108 $20.00 $2,160.00
LF 156 $40.00 $6,320.00
LB 1020 $4.00 $4,080.00
EA 62 $500.00 $31,000.00
Total Estimated Construction Cost $142,470.00
Sa
CENTRAL AVENUE IMPROVEMENT PROJECT
CITY PROJECT 9912a
No. Description
CONSTRUCTION COST ESTIMATE
STREETSCAPING
Unit
Unit Quantit~ Price Amount
1 Remove Miscellaneous Structures
2 Concrete Planter Curb
3 4" Concrete Walk Special (Colored Concrete)
4 Waste Receptacle
5 Bench
6 Lighting Unit Type Special 1 (Pedestrian Light)
7 Lighting Unit Type Special 1 (Street Light)
8 Electrical Service (Service Point)
9 Concrete Planter w/Select Topsoil Borrow
10 Deciduous Tree (2.5" Cai B&B)
11 Shrub (No5 Cont)
12 Tree Grate
LS 1 $42,500.00 $42,500.00
LF 480 $12.00 $5,760.00
SF 16120 $6.50 $104,780.00
EA 8 $700.00 $5,600.00
EA 6 $1,100.00 $6,600.00
EA 53 $4,200.00 $222,600.00
EA 40 $2,800.00 $112,000.00
EA 2 $10,000.00 $20,000.00
EA 17 $800.00 $13,600.00
EA 58 $700.00 $40,600.00
EA 100 $40.00 $4,000.00
EA 35 $700.00 $24,500.00
Total Estimated Construction Cost $602,540.00
8b
Z
Z Z
m rn
m m
m
Z
O0
ZZ
m
m
Z
NN
O0
Z Z
nlm
PLOT DATE: Feb 14~1 8:§2om DISK FILE NAME: (15.0) R:~33910~33910004~EXHlSIT~CityfesO1.dw,j~ll~. ~
--J 9[
9L
39TH AVE.
MATCH LINE 7+00
z =
r'
--X
9
PLOT OATE: Feb 14.~1 9:090m DISK FILE NAME: (15.0) R:~33910~33910004~EXNIBIT~CltyfesO2. dw.
MATCH
LINE 23+00
41ST AVE."
I
IIIIi
MATCH UNE 31+00
MATCH UNE 15+00
GOULD-AVE.
L1
J
MATCH LINE 23+00
?
?
0
/ I
PLOT DATE: Feb 14,~=~1 9:32om DISK FiLE NAME: (15.0) R:~33910~33910004~EXHIBIT~CltyfesO3. dw~.
MATCH UNE 31+00
42ND AVE -=
I ~1 ~
m
I
O~
RESOLUTION NO. 200082
A RESOLUTION ESTABLISHING RESTRICTIVE ACCOUNTS FOR EXCESS
~'~E PENSION RESIDUAL ASSETS AND ADOPTING A PLAN FOR 'I'I~E
EXPENDITURE OF SUCH ASSETS
Where4u, Minnesota Law 1999 C~pter 222, titled Omm'b~ Retirement Bill, ~ made
substantial ch,~es to public employee pensions in Minncso~ including the total merger of
Columbia Heights Fi~ Pension Plan; and
Whereas, one of the~ ,~h*,~ges permits the return of the excess funding f~om the fire
consolidation account to the local jurisdiction; and
Wh~rens. the portfioa of exc~s fuuain~ avsihble for return to the City of Columbia Heights
approximately $6?8,958,
Whcrces thc city of Columbia Height* Las ~ an ~dverfised public heating on Novembez 27, 2000,
at which public heming the proposed use of the fire residual assets were discuzs~d and n sp~di-%a plan
approved.
NOW THEREFORE BE IT RESOLVED that the City of Columbia Heights, b~innesot~, adops the
following plan for the ~cxipt and u~e ofthe~e excess fond as~ts.
1. The excess funds troy be used to assist ~he Fire Deparanont in the funding of the Fir~
Capi~l Outiay fund.
2. The excess 6ma. may also be used to assist the Fire Depanmont/n fund/nE the
~ ofa n~v ~JV.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF COLUMBIA ttF. IGHTS
THIS 27~ DAY OF MARCH 2000.
Pa~'icia Muscovit~ Delmty C~ty Clerk
Mayor Coary L Peterson