HomeMy WebLinkAboutResolution 99-32RESOLUTION N0.99-32
BEING A RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed
improvement of an alley, Circle Terrace Boulevard to ReServoir Boulevard, 645
feet south of 41st Avenue to 41"t Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon ~he 29th day of March,
1999, at which all persons desiring to be heard were given an opportunity to be
heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS,
MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate
base, new concrete surfacing, required retaining wall, concrete or
bituminous driveway, service walk/step and sod replacement and
miscellaneous construction items. The proposed alley width 10 feet or 12
feet.
Such improvement is necessary, cost-effective, and feasible as detailed in
the feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999·
4. These improvements shall also be known as P.I.R. 995 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Szurek
Roll Call: All ayes
- e Student, Deputy City Clerk