Loading...
HomeMy WebLinkAboutResolution 99-39 R E S 0 L U T I 0 N NO. 99-39 BEING A RESOLUTION ORDERING IMPROVEMENT ~ PREPAP, ATION OF PLANS WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th day of March, 1999, fixed a date for a council hearing on the proposed improvement of an alley, California Street to Main Street,250 feet north of 39th Avenue to 570 feet north of 39th Avenue AND WHEREAS, ten days mailed notice and twice published notice of the hearing a week apart was given, and the hearing was held thereon the 29th day of March, 1999, at which all persons desiring to be heard were given an opportunity to be heard thereon, W'HEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: 1. That the extent of such improvements is as follows: Bituminous alley construction. Work includes required utility work, new granular sub-base, new aggregate base, new bituminous surfacing, required concrete or bituminous driveway, service walk replacement and sod and miscellaneous associated construction items. The proposed alley width is 12 feet. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. Such improvement is hereby ordered as proposed in the Council Resolution adopted 8th day of March, 1999. 4. These improvements shall also be known as P.I.R. 986 - Project #9902. Kevin Hansen is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Council this 29th day of March, 1999. Offered by: Wyckoff Seconded by: Szurek Roll Call: All ayes Deputy City Clerk .LUMBIA[tUMT~~ESOTA