Loading...
HomeMy WebLinkAboutResolution 99-75RESOLUTION N0.99-75 BEING A RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS WHEREAS, the Columbia Heights City Council received a petition to construct a concrete alley and by Resolution No. 99-71 the 23~ day of August, 1999, fixed a date for a council hearing on the proposed improvement of an alley, West of Reservoir Boulevard and from 150~ South of Circle Terrace Boulevard to Circle Terrace Boulevard. AND WHEREAS, ten days mailed notice and twice published notice of the hearing a week apart was given, and the hearing was held thereon the 13th day of September, 1999, at which all persons desiring to be heard were given an opportunity to be heard thereon, WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BE IT RESOLVED BY TH~ COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: 1. That the extent of such improvements is as follows: Concrete alley construction, 12 feet in width. Work includes required utility work, new granular sub-base, new aggregate base, new concrete surfacing, required retaining wall, concrete or bituminous driveway, service walk/step and sod replacement and miscellaneous construction items. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. Such improvement is hereby ordered as proposed in Resolution No. 99 - 71 on 23~ day of August, 1999. 4. These improvements shall also be known as P.I.R. 1017 - Project #9902. Keyin Hansen is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Council this 13~ day of September, 1999. Offered by: Hunter Seconded by: Jolly Roll Call: Ali ayes ~o-~e St~4~dent, Deputy C~~~qity Clerk CITY OF COL~S, Gary L. Pe[e~so~', Mayor MINNESOTA