Loading...
HomeMy WebLinkAboutResolution 2000-29 R ~ S 0 L U T I 0 N NO. 2000 - 29 B~IN3 A R~SOLUTION ORD!~RIN~ IMPROV~M~I~ ~ PR~P~It~TION OF PLANS WHEREAS, Resolution No. 2000-17 of the Columbia Heights City Council adopted the 28TM day of February, 2000, fixed a date for a council hearing on the proposed improvement of Monroe Street from 49th Avenue to 51st Avenue AND WHEREAS, ten days mailed notice and two published notice of the hearing a week apart was given, and the hearing was held thereon the 20th day of March, 2000, at which all persons desiring to be heard were given an opportunity to be heard thereon, WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW THEREFORE, BN IT RNSOL%'ED BY TH~ COUNCIL OF THE CITY OF COLUMBIA HEIGHTS, MINN~SOTA: 1. That the location and extent of such improvements is as follows: Mill and Overlay of Monroe Street from 49tn Avenue to 51st Avenue. Work includes required utility reconstruction, spot concrete curb and gutter replacement, milling of the existing street surface, new bituminous pavement, restoration and appurtenances. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. Such improvement is hereby ordered as proposed in the Council Resolution adopted 28tn day of February, 2000. 4. These improvements shall also be known as P.I.R. #1026 - Project 0002. Kevin Hansen is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Council this 20tn day of March, 2000. Offered by: Szurek Seconded by: Hunter Roll Call: All ayes ia Muscovitz, Deput~City Clerk C3~IA HEIGHTS, MINNESOTA Donald G. Jolly,~C ~ident (