HomeMy WebLinkAboutResolution 2000-29 R ~ S 0 L U T I 0 N NO. 2000 - 29
B~IN3 A R~SOLUTION ORD!~RIN~ IMPROV~M~I~ ~ PR~P~It~TION OF PLANS
WHEREAS, Resolution No. 2000-17 of the Columbia Heights City Council adopted the
28TM day of February, 2000, fixed a date for a council hearing on the proposed
improvement of Monroe Street from 49th Avenue to 51st Avenue
AND WHEREAS, ten days mailed notice and two published notice of the hearing a
week apart was given, and the hearing was held thereon the 20th day of March,
2000, at which all persons desiring to be heard were given an opportunity to be
heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BN IT RNSOL%'ED BY TH~ COUNCIL OF THE CITY OF COLUMBIA HEIGHTS,
MINN~SOTA:
1. That the location and extent of such improvements is as follows:
Mill and Overlay of Monroe Street from 49tn Avenue to 51st Avenue.
Work includes required utility reconstruction, spot concrete curb and
gutter replacement, milling of the existing street surface, new bituminous
pavement, restoration and appurtenances.
Such improvement is necessary, cost-effective, and feasible as detailed in
the feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 28tn day of February, 2000.
4. These improvements shall also be known as P.I.R. #1026 - Project 0002.
Kevin Hansen is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 20tn day of March, 2000.
Offered by: Szurek
Seconded by: Hunter
Roll Call: All ayes
ia Muscovitz, Deput~City
Clerk
C3~IA HEIGHTS, MINNESOTA
Donald G. Jolly,~C ~ident
(