HomeMy WebLinkAboutNovember 16, 1992 Special MeetingNOTICE OF OFFICIAL MEETING Notice is hereby given that an official meeting is to be held in the City of Columbia Heights as follows: Meeting of: MAYOR, CITY COUNCIL, AND CITY MANAGER Date of Meeting: MONDAY, NOVEMBER 16, 1992 Time of Meeting: 8:00 PM Location of Meeting: COUNCIL CHAMBERS 590 40TH AVENUE N.E. Purpose of Meeting: SPECIAL MEETING 1. Call To Order and Roll Call 2. Consider Roofing Repairs to J.P.M. Hall RECOMMENDED MOTION: Move to accept the bid from Milton Johnson Co. to reroof the entire back side of Murzyn Hall (option 2) according to the specifications and written bid for $9,200 which includes all materials, labor, and the removal of waste; and, furthermore, that the Mayor and City Manager be authorized to enter into a contract for same. 3. Adjourn Auxiliary aids for handicapped persons are available upon request when the request is made at least 96 hours in advance. Please call the City Council Secretary at 782-2800, Extension 209, to make arrangements. CITY OF COLUMBIA HEIGHTS MEETING OF: November 16, 1992 AGENDA SECTION: NEW BUSINESS ORIGINATING DEPARTMENT: CITY MGR NO: 9 CITY MANAGER'S APPROVAL ITEM: REROOFING OF JOHN MURZYN HALL BY: S.W. ANDERSON BY: NO: DATE: 11/13/92 When John P. Murzyn Hall was last roofed, the lower part of the back side of the roof was covered with a rolled material rather than with shingles. This rolled area is now deteriorating and water has rotted some of the wood roof sheeting. This problem must be corrected as soon as possible to avoid additional damage to the interior of the building. A written specification was provided to several potential bidders and we have received three written proposals. We offered Option 1, to just repair the rolled area; and Option 2, to do the rolled area plus the balance of the rear side of the building. The 1992 projected Murzyn Hall budget has approximately $9,000 in the Capital Improvement budget which could fund this repair project. I believe it would be the best value to do the entire back side at this time. Following are the bid prices: Option i Option 2 Milton Johnson Co. $6,425.00 $9,200 Northside Contractor $7,350.00 plus wood @ $1.40 per square foot $11,450 plus wood at $1.40 per square foot M.J. Moser Construction $7,400.00 plus cost of replacing boards $10,700 plus cost of replacing boards RECOMMENDED MOTION: Move to accept the bid from Milton Johnson Co. to reroof the entire back side of Murzyn Hall (option 2) according to the specifications and written bid for $9,200 which includes all materials, labor, and the removal of waste; and, furthermore, that the Mayor and City Manager be authorized to enter into a contract for same. COUNCIL ACTION: