Loading...
HomeMy WebLinkAboutApr 25, 1980CITY OF COLUMBIA HEIGHTS TO: FROM: SUBJECT: DATE: ROBERT S. BOCWIHSKI, CITY MANAGER FREDRICK V. SALSBURY, DIRECTOR OF PUBLIC WORKS C.I.P. PROGRAM APRIL 25, 1980 The program as it stands at this time is as outlined below: I. PROJECTS PROPOSED, BUDGETED AND AUTHORIZED PROJECT TYPE WORK FUNDING ESTIMATE OF WORK 1. Downtown Utility Study Study (Consultant) 2. 37th Ave.-Main to Central Design, Hearing, 3. Street Condition Study 4. Alley-W. of Chatham, S. of Fairway 5. Prestemon Park Parking Lot 6. Mathaire Park Hockey Rink 7. Sullivan Lake Park Water Supply 8. Master Plans-Sullivan Lake Park, Huset Park, Prestemon Park $ $,000 Assessment 475,000 Construction & MSAS Study Eng. budget 8,000 Design, Hearing, Assessment 7,000 Construction Design, Construction Park fund 18,000 Construction Sullivan Lake 5,000 fund Design, Construction Sullivan Lake 43,000 fund Study (Consultant), Sullivan Lake 6,000 Design fund 9. Sidewalks-several parks Design, Construction Sullivan Lake 2,000 fund 10. Seal Coat Program-NW area Design, Construction Assessment 130,000 & MSAS 11. Meter Program Study Study Water fund 4,000 II. PROJECTS BUDGETED, DISCUSSED AND PROPOSED, BUT NOT SPECIFICALLY AUTHORIZED AS A PROJECT ESTIMATE OF PROJECT TYPE WORK FUNDING WORK 1. Crestview Rd.(Moon St.) Design & Hearing Assessment & $ 20,000+ Land Acquisition 2. 41st: Ave.-Central to Design Downtown Outside LaBelle Park Developer funding 3. ~th St.-40th-45th Design, Hearing Assessment 6,000 4. Hilltop II Subdivision Design, Hearing Assessment 15,OOO 5. Outlet Structures- Study General fund 4,000 Sullivan Lake, LaBelle Pond, Highland Lake LaBelle Park-Erosion Problem 6. Study Park fund & 8,000 S.C. Grant -2- III. PROJECTS PROPOSED, NOT BUDGETED, NOT AUTHORIZED ESTIMATE OF PROJECT TYPE WORK FUNDING WORK 1. Alley-2½ St. to 3rd St. Design, Hearing, Assessment $ 7,000 37th Ave. to 3$th Ave. Construction 2. Alley-6th St. to 7th St. Design, Hearing, Assessment 8,000 49th Ave. to 50th Ave. Construction 3. Alley-Monroe to Madison Design, Hearing Assessment 2,000 40th to 41st Ave. 4. Backlot Drainage Design, Hearing Assessment 5,000 41st to 43rd Ave. -Res.-Tyler 5. Backlot Drainage Design, Hearing Assessment 500 1129 42½ Ave. 6. Alley-Polk to Tyler, Design, Hearing Assessment 1,500 37th to 39th Ave. Several projects for which there has been some concern would and could be in- cluded in 1981's C.I.P. Example's are: 1. Alley between Polk and Tyler, 39th Ave. to Ostrander Park, included with 39th Ave. project. 2. Blinkmanls property on Stinson, included with the Stinson project from 45th Avenue to Silver Lake Beach. The above items deal with design and engineering. The purpose of seeking Council approval is to better allocate our Engineering Department time and work load. By approving the above, the projects will be established, thus authorizing staff to begin the necessary engineering designs and preliminary survey data.