Loading...
HomeMy WebLinkAboutResolution 75-40CITY OF COLUMBIA HEIGHTS ADMINISTRATIVE OFFICES EQUAL OPPQRTUNITY EMPLOYER 788-9221 · COLUMBIA HEIGHTS, MINNESOTA 55421 RESOLUTION #75-40 BEING A RESOLUTION TO OBTAIN A CERTAIN EASEMENT FOR THE CONTINUED MAINTENANCE OF A STORM DRAIN WHEREAS, the CITY OF COLUMBIA HEIGHTS acquired a certain easement for the placement of a storm drain on Lot 10, Block 2, Reservoir Hills, in 1962, and WHEREAS, a recent survey has shown that the storm drain installed in said lot is not within the confines of the certain easement, and WHEREAS,the encroachment upon said lot limits the selection and placement of a house on said lot, and WHEREAS,the encroachment would cause the owner of the tot an additional expenditure in providing proper footings for the placement of a house, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COLUMBIA HEIGHTS: 1. That the City Manager acquire an easement for the continued maintenance of a storm drain over, across and under that part of the West 55 feet of the South 165 feet of Lot Ten (10), Block Two (2), Reservoir Bills, lying Westerly of the following described line: Beginning at a point on the South line of said Lot Ten (10) distant 5.5 feet East of the Southwest corner thereof; thence Northerly to a point on the North line of the South 165 feet of said lot distant 12.4 feet East of the West line of said Lot Ten (10) thereof and there terminating. RESOLUTION NO. #75-40 Page Two 2. The City of Columbia Heights shall pay to the owners of said lot through their contractor the cost difference between the footing design that would support the proposed house if no trench area existed and the design that is necessary to support the proposed house with the existing trench. With actual costs not to exceed $1,000.00. Passed this 14th day of July, 1975. Offered by: Land Seconded by: Norberg Roll Call: All Ayes Bruce G. ~awrocki, Mayor S cre t