Loading...
HomeMy WebLinkAboutResolution 91-17R E S O L U T I O N N0. 91 - ]7 BEING A RESOLUTION ORDERING IMPROVEMENTS BE IT HEREBY RESOLVED by the City of Columbia Heights by motion on the llth day of February, 1991 ordered notice of a hearing to be given to property owners, and WHEREAS, pursuant to a notice of hearing certain residents appeared at a Council Meeting on the 14th day of March 1991, and on the 25th day of March 1991, and WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW, THEREFORE, IT IS HEREBY RESOLVED: 1. That the location and extent of such improvements is as follows: Construction of 38th Avenue N.E., from 323 feet east of 5th Street N.E. to Madison Place N.E. The proposed road is 37 feet from back of curb to back of curb (existing bituminous width is 33 feet). Work would include watermain and storm sewer replacement, new concrete curb and gutter including driveway aprons, required driveway replacement, concrete service walk replacement, new aggregate base, new bituminous surfacing, resodding, and miscellaneous associated construction items. 2. That the materials to be used are as follows: Aggregate base, bituminous surfacing, concrete curb and gutter, concrete driveway aprons and servicewalk, sod, DIP watermain and copper services, reinforced concrete storm sewer pipe, concrete manholes and catch basins and various appurtenances. That a careful estimate of the cost of the improvements has been made by the City Manager and the several lots and parcels of land fronting upon and adjacent~to such proposed improvements, which be deemed benefited thereby, were properly notified of said hearings, and That the City Manager shall also list the names and owners of the several parcels so improved as nearly as can be ascertained. That the City Manager shall proceed with taking of bids for the improvements, or portions of the improvements as stated herein. 6. That the City shall pay 25Z of the Street construction cost. 7. These improvements shall also be known as P.I.R. #841 - Project 8721. Passed this 25th day of March, 1991. Offered by: Ruettimann Seconded by: Peterson Roll Call: AIl ayes cretary to ~he Counc~ Edward M. Carlson, Mayor