HomeMy WebLinkAboutResolution 91-45R E S O L U T I O N NO. 91 - 45
BEING A RESOLUTION ORDERING IMPROVEMENTS
BE IT HEREBY RESOLVED by the City of Columbia Heights on the 10th day of June,
1991 ordered notice of a hearing to be given to property owners, and
WHEREAS, pursuant to a notice of hearing certain residents appeared at a Council
Meeting on the 5th day of August, 1991, and
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW, THEREFORE, IT IS HEREBY RESOLVED:
1. That the location and extent of such improvements is as follows:
Alley construction, from Taylor Street N.E. to Fillmore Street N.E.,
between 45th Avenue N.E. and 46th Avenue N.E.
The proposed alley is 12 feet in width. Work would include new aggregate
base, new bituminous alley surfacing, concrete curb and gutter with alley
apron replacement, required concrete slope paving and bituminous driveway
replacement, resodding, and miscellaneous associated construction items.
2. That the materials to be used are as follows:
Aggregate base, bituminous surfacing, concrete curb & gutter, concrete
alley aprons and slope paving, sod, various related construction items.
o
That a careful estimate of the cost of the improvements has been made by
the City Manager and the several lots and parcels of land fronting upon
and adjacent to such proposed improvements, which be deemed benefitted
thereby, were properly notified of said hearings, and
That the City Manager shall also list the names and owners of the several
parcels so improved as nearly as can be ascertained.
That the City Manager shall proceed with taking of bids for the
improvements, or portions of the improvements as stated herein.
6. These improvements shall also be known as P.I.R. ~876 - Project 9108.
Passed this 5th day of August, 1991.
Offered by: Nawrocki
Seconded by: Clerkin
Roll Call: Ail Ayes
cretary to the Council
Edward M. Carlson, Mayor