HomeMy WebLinkAboutResolution 97-05 RESOLUTION NO. 97 05
BEING A RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS
WHEREAS, Resolution No. 96-89 of the Columbia Heights City Council adopted the
23rd day of December, 1996, fixed a date for a council hearing on the proposed
improvement of Tyler Street from the north right-of-way of 37th Avenue to north
right-of-way of 39th Avenue
~ WHEREAS, ten days' mailed notice and two weeks' published notice of the
hearing was given, and the hearing was held thereon the 14th day of January,
1997, at which all persons desiring to be heard were given an opportunity to be
heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS,
MINNESOTA:
1. That the location and extent of such improvements is as follows:
Street reconstruction of Tyler Street, 37th Ave. N.E. to 39th Ave. N.E.
Work includes new concrete curb and gutter, including driveway aprons, new
aggregate or recycled bituminous base, new bituminous surfacing, required
concrete or bituminous driveway and concrete sidewalk replacement,
resodding and miscellaneous associated construction items. The roadway
width will remain at 31' from back of curb to back of curb.
Such improvement is necessary, cost-effective, and feasible as detailed in
the feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 23rd day of December, 1996.
These improvements shall also be known as P.I.R. #935 Project 9614.
Mark Winson is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 14th day of January, 1997.
Offered by: Ruettimann
Seconded by:
Peterson
Roll Call: Ail ayes
-Anne Student, ~eputy City Clerk
CITY OF COLUMBIA HEIGHTS, MINNESOTA
/~/Jo~eD~ gkurdevant, Mayor