HomeMy WebLinkAboutResolution 97-12 R E S 0 L U T I O N NO. 97 12
BEING A RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS
WHEREAS, Resolution No. 96-89 of the Columbia Heights City Council adopted the
23rd day of December, 1996, fixed a date for a council hearing on the proposed
improvement of Tyler Street from the centerline of 42nd Avenue to centerline of
44th Avenue
AND WHEREAS, ten days' mailed notice and two weeks' published notice of the
hearing was given, and the hearing was held thereon the 14th day of January,
1997, at which all persons desiring to be heard were given an opportunity to be
heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF COLUMBIA HEIGHTS,
MINNESOTA:
1. That the location and extent of such improvements is as follows:
Milling and bituminous overlay of Tyler Street, 42nd Ave. N.E. to 44th
Ave. N.E.
Work includes removing up to 2" of the bituminous surface and placing a 2"
overlay, required concrete curb and gutter and concrete or bituminous
driveway replacement, and miscellaneous associated construction items.
The roadway width will remain the same.
Such improvement is necessary, cost-effective, and feasible as detailed in
the feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 23rd day of Decenfoer, 1996.
4. These improvements shall also be known as P.I.R. #952 - Project 9615.
Mark Winson is hereby designated as the engineer for this improvement.
The engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 14th day of January, 1997.
Offered by:
Ruettimann
Seconded by: Jones
Roll Call: Ail ayes
o-Anne'StudeJt, ~ep~y City Clerk
CITY OF COLUMBIA HEIGHTS, MINNESOTA
,//o~ph ~/urd~ant, ~a!/or