HomeMy WebLinkAboutResolution 95-33 RE SOL U T I ON NO. g5-33
BEING A RESOLUTION ORDERING IMPROVEMENTS
BE IT HEREBY RESOLVED by the City of Columbia Heights on the 26th day of June,
1995 ordered notice of a hearing to be given to property owners, and
WHEREAS, pursuant to a notice of hearing certain residents appeared at a Council
Meeting on the 24th day of July, 1995, and
WHEREAS, the Council determines to proceed with this local improvement, a portion
of the cost being defrayed by special assessments under Charter provisions.
NOW, THEREFORE, IT IS HEREBY RESOLVED:
1. That the location and extent of such improvements is as follows:
Alley construction, from 3/th Avenue N.E. to 38th Avenue N.E., West of
Quincy Street.
The proposed alley is 12 feet in width. Work would include new aggregate
base, new bituminous alley surfacing, concrete curb and gutter with alley
apron replacement, concrete sidewalk replacement, required concrete step
replacement, resodding, and miscellaneous associated construction items.
2. lhat the materials to be used are as follows:
Aggregate base, bituminous surfacing, concrete curb & gutter, concrete
sidewalk and alley aprons, sod, and various related construction items.
3. lhat a careful estimate of the cost of the improvements has been made by
the City Manager and the several lots and parcels of land fronting upon
and adjacent to such proposed improvements, which be deemed benefited
thereby, were properly notified of said hearings, and
4. That the City Manager shall also list the names and owners of the several
parcels so improved as nearly as can be ascertained.
5. That the City Manager shall proceed with the improvements, or portions of
the improvements as stated herein.
6. lhese improvements shall also be known as P.I.R. #g21 - Project 9515.
Passed this 24th day of July, 1995.
Offered by: Jolly
Seconded by: Peterson
Roll Call: All ayes
/ecretary to t~he Cou~l~-K1
oseph/Sturdevant, Mayor