HomeMy WebLinkAboutMarch 29, 1999pubimphrgOFFICIAL PROCEEDINGS
COLUMBIA HEIGHTS CITY COUNCIL
PUBLIC IMPROVEMENT HEARING
MARCH 29, 1999
1. CALL TO ORDER/ROLL CALL
Mayor Peterson called the Public Improvement Hearing to order at 7:05 p.m.
Present were Mayor Peterson and Councilmembers Szurek, Jolly and Wyckoff.
2. PUBLIC IMPROVEMENT HEARING:: 1999 ALLEY REHABILITATION PROGRAM
A. Presentation by Staff
The Public Works Director addressed the proposed projects within the rehabilitation program. He
stated that the project costs total $525,000. The two sources of funding for these costs are
individual property assessments for those benefitting properties and State Aid funds. Sixty percent
of the costs will be paid by State Aid funds.
An informational meeting was held on these projects on March 23rd All affected property owners
were advised by mail of this meeting. Comments made at the informational meeting were included
in the agenda packet for this Improvement Hearing.
The Public Works Director advised that a majority vote of the Council is necessary to approve
assessments. He also advised that if individual property owners will be experiencing multiple
assessments there will be an opportunity for deferral. He then addressed the longevity and
wearability of a concrete surface versus a bituminous surface. Most of the alleys being
rehabilitated will be with concrete.
B. Questions/Comments from City Council and Public
1) The owner of rental property at 615 40th Avenue stated his opposition to vacating the alley
adjacent to his building. He said that without this alley he could not continue to provide off-street
parking for his tenants. There would also be a problem with storage of plowed snow and
accessing the vehicle plug-ins for his tenants. He will discuss this matter further with the Public
Works Director.
2) The owner at 4140 Reservoir Boulevard questioned the validity of assessing properties which
do not use the alley. The Public Works Director responded that "abutting" properties are
assessed as per the city policy.
Page - 1-
3) The owner at 4842 Monroe Street submitted a petition signed by fourteen of the nineteen
property owners on the alley. Only five garages use the alley. He felt the alley was not a necessity
nor is its surface.
4) The owner at 4260 Tyler Street said that four of the five affected property owners were
opposed to the improvement. He quoted from the City Charter a section pertaining to
assessments.
5) The owner at 4440 Van Buren Street presented a petition in opposition to the alley
improvement. He felt the alley was dangerous. The property owner at 4449 Jackson Street
recalled a previous petition having been presented in opposition to the alley improvement.
6) The property owner at 1231 40th Avenue had numerous questions regarding the proposed
improvement, the rate of interest and what appeared to him to be an inequity with the per parcel
charge formula.
The City Manager cited the intent of the Council is not to be a lending agency therefore the 8%
interest rate was selected. This may encourage property owners to seek financing some place else.
7) The owner of 834 40th Avenue felt the manner in which commercial property is being assessed
is not equitable.
Another property owner stated he felt the work could be done to improve his alley much less
expensive than the assessment reflected. Only four property owners are being assessed for the
alley although he noted all persons in the area use it.
8) The resident at 4724 Fourth Street recalled the City having purchased some paving equipment
in the last few years. He inquired if this equipment could be used and the City could do the work.
The Public Works Director responded that this equipment had the capabilities of doing
miscellaneous repair, street patching and surface improvements of public parking lots.
In response to an inquiry regarding using asphalt instead of concrete for these projects, the Public
Works Director cited numerous reasons why concrete is superior.
9) The resident at 4036 Reservoir Boulevard had numerous questions regarding the alley. He
supports resurfacing it but wanted it straightened, have drainage addressed and the grade properly
aligned.
10) The property owner at 4833 Madison Street questioned the importance of repairing alleys. He
would be much more supportive of some other activities which focused on people and behavior.
11) The property owners at 4421 Jackson Street both addressed their concerns with the proposed
Page -2-
alley improvement in their block. They are thirty-eight year residents. They oppose any
improvement as they felt this would encourage usage by people who didn't live in the area and
increase speed of the vehicles going from 44th to 45th. There had been petitions submitted from
both sides of this alley opposing the improvement.
12) The resident at 960 40th Avenue opposes improvement of the alley behind her property. She
suggested if improvements are to be done that funds from the liquor operation profits should be
used.
13) The resident at 1055 Peters Place explained how he will be paying on more than one
assessment if his alley improvement is approved. He also stated he is waiting to pave his driveway
until he completes his house addition. This would be done in about five years. He also has concern
with a tree on his property, two alleys adjacent to his home slated for improvement and
underground installation of utility wires. He was referred to the Traffic Commission with his
concern regarding through traffic in his alley.
14) The owner of the property at 5253 Fourth Street is supportive of the improvement of his
alley. He noted that only the northern portion is slated for improvement. He requested a letter
stating that property owners who pay for this portion of the alley will not be responsible for
paying assessments for the southern portion if it is ever improved.
C. Close the Public Hearing
The Mayor closed the Public Improvement Hearing at 10:25 p.m.
D. Consideration of Resolutions
1) Summit to 40th - Lookout to Fifth - Resolution No. 99-25
Motion by Szurek, second by Jolly to waive the reading of the resolution there being ample copies
available for the public. Roll call: All ayes
RESOLUTION NO. 99 -25
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, Gould Avenue to 40th Avenue (east end),north-south alley to 80 feet west of north-
south alley
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
Page -3-
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 987 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Szurek
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
2) University to 4th - 47th to 48th - Resolution No. 99-26
Page -4-
Motion by Wyckoff, second by Jolly to waive the reading of the resolution there being ample
copies available for the public.
RESOLUTION NO. 99 -26
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, University Avenue Service Drive to 4th Street, 47th Avenue to 48th Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 988 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Page -5-
Offered by: Wyckoff
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
3) 40th to 41st - N-S alley to Jefferson - Resolution No. 99-27
It was felt further discussion with the affected property owners should take place before
any decision is made on this alley.
Motion by Jolly, second by Szurek to table this matter until the second Council meeting in
April. Roll call: All ayes
4) Madison to Monroe - 48th to 49th - Resolution No. 99-28
Motion by Wyckoff, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99 -28
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, Madison Street to Monroe Street, 48th Avenue to 49th Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Page -6-
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 990 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Wyckoff
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
5) 39th to 40th - Jackson to N-S Alley - Resolution No. 99-29
Motion by Jolly, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99 -29
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
Page -7-
alley, 39th Avenue to 40th Avenue, Jackson Street to north-south alley
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 991 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Szurek
Roll Call: All ayes
Gary L. Peterson, Mayor
6) Jackson to Van Buren - 150' N of 44th to 45th - Resolution No. 99-30
Page -8-
It was generally felt the disposition of this alley should have more discussion.
Motion by Jolly, second by Szurek to table this matter until the second Council meeting in
April. Roll call: All ayes
7) Peters Place to Reservoir - Peters Place to Gould - Resolution No. 99-31
Motion by Wyckoff, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99 -31
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Peters Place to Reservoir Boulevard, Peters Place to Gould Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
Page -9-
These improvements shall also be known as P.I.R. 993 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement.
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Wyckoff
Seconded by: Szurek
Roll Call: All ayes
Jo-Anne Student, Deputy City Clerk
Gary L. Peterson, Mayor
8) Circle Terrace to Reservoir - 645' S of 41st to 41st - Resolution No. 99-32
The
Motion by Jolly, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99 - 32
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Circle Terrace Boulevard to Reservoir Boulevard, 645 feet south of 41st
Avenue to 41st Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Page - 10-
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 995 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Szurek
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
9) W of Reservoir - Circle Terrace to 42nd - Resolution No. 99-33
Motion by Wyckoff, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99- 33
BEING A RESOLUTION ORDERING IMPROVEMENTS
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, west of Reservoir Boulevard, Circle Terrace Boulevard to 42nd Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
Page - 11-
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 996 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Wyckoff
Seconded by: Szurek
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
10) Reservoir to Tyler - 40th to 41st - Resolution No. 99-34
Page - 12-
Motion by Szurek, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99- 34
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Reservoir Boulevard to Tyler Street, 40th Avenue to 41 st Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 997 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Page - 13-
Adopted by the Council this 29th day of March, 1999.
Offered by: Szurek
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
11) Reservoir to Tyler - 226' S of 43rd to 43rd - Resolution No. 99-35
Motion by Jolly, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-35
BEING A RESOLUTION ORDERING IMPROVEMENT AND
PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Reservoir Boulevard to Tyler Street, 226 feet south of 43rd Avenue to 43rd
Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
Page - 14-
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 998 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Szurek
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
12) Reservoir to Tyler - 43rd to 44th - Resolution No. 99-36
Motion by Wyckoff, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-36
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Reservoir Boulevard to Tyler Street, 43rd Avenue to 44th Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
Page - 15-
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 999 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Wyckoff
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
13) 4th to 5th - 300' N of 52nd to 53rd - Resolution No. 99-37
Page - 16-
Motion by Szurek, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-37
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, 4th Street to 5th Street, 300 feet north of 52nd Avenue to 53rd Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 1009 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Page - 17-
Adopted by the Council this 29th day of March, 1999.
Offered by: Szurek
Seconded by: Jolly
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
14) Peters Place to Gould - Peters Place to N-S Alley - Resolution No. 99-38
Motion by Jolly, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-38
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99 - 19 of the Columbia Heights City Council adopted the
8th day of March, 1999, fixed a date for a council hearing on the proposed improvement
of an alley, Peters Place to Gould Avenue, Peters Place to north-south alley
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Concrete alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
concrete surfacing, required retaining wall, concrete or bituminous driveway, service
walk/step and sod replacement and miscellaneous construction items. The proposed alley
width 10 feet or 12 feet.
Page - 18-
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
These improvements shall also be known as P.I.R. 1011 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Wyckoff
Roll Call: All ayes
Jo-Anne Student, Deputy City Clerk
Gary L. Peterson, Mayor
15) California to Main - 250' N to 39th to 570' N of 39th - Resolution No. 99-39
Motion by Wyckoff, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-39
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, California Street to Main Street,250 feet north of 39th Avenue to 570 feet north of
39th Avenue
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
Page - 19-
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY
OF COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Bituminous alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
bituminous surfacing, required concrete or bituminous driveway, service walk replacement
and sod and miscellaneous associated construction items. The proposed alley width is 12
feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
These improvements shall also be known as P.I.R. 986 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Wyckoff
Seconded by: Szurek
Roll Call: All ayes
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
16) Gould to 40th (west end) - N - S Alley to 87' E of N-S Alley - Resolution No. 99-40
Motion by Szurek, second by Jolly to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-40
BEING A RESOLUTION ORDERING IMPROVEMENT
Page -20-
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, Gould Avenue to 40th Avenue (west end),north-south alley to 87 feet east of north-
south alley
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Bituminous alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
bituminous surfacing, required concrete or bituminous driveway, service walk replacement
and sod and miscellaneous associated construction items. The proposed alley width is 12
feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
Such improvement is hereby ordered as proposed in the Council Resolution
adopted 8th day of March, 1999.
4. These improvements shall also be known as P.I.R. 994 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Szurek
Seconded by: Jolly
Roll Call: All ayes
Page -21-
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
17) Gould to 40th (east end) - N-S alley to 80' W of N-S alley - Resolution No. 99-41
Motion by Jolly, second by Szurek to waive the reading of the resolution there being
ample copies available for the public. Roll call: All ayes
RESOLUTION NO. 99-41
BEING A RESOLUTION ORDERING IMPROVEMENT
AND PREPARATION OF PLANS
WHEREAS, Resolution No. 99-19 of the Columbia Heights City Council adopted the 8th
day of March, 1999, fixed a date for a council hearing on the proposed improvement of an
alley, Gould Avenue to 40th Avenue (east end),north-south alley to 80 feet west of north-
south alley
AND WHEREAS, ten days mailed notice and twice published notice of the hearing a
week apart was given, and the hearing was held thereon the 29th day of March, 1999, at
which all persons desiring to be heard were given an opportunity to be heard thereon,
WHEREAS, the Council determines to proceed with this local improvement, a portion of
the cost being defrayed by special assessments under Charter provisions.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
COLUMBIA HEIGHTS, MINNESOTA:
1. That the extent of such improvements is as follows:
Bituminous alley construction.
Work includes required utility work, new granular sub-base, new aggregate base, new
bituminous surfacing, required concrete or bituminous driveway, service walk replacement
and sod and miscellaneous associated construction items. The proposed alley width is 12
feet.
Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
3. Such improvement is hereby ordered as proposed in the Council Resolution
Page -22-
adopted 8th day of March, 1999.
These improvements shall also be known as P.I.R. 1010 - Project #9902.
Kevin Hansen is hereby designated as the engineer for this improvement.
engineer shall prepare plans and specifications for the making of such
improvement.
Adopted by the Council this 29th day of March, 1999.
Offered by: Jolly
Seconded by: Szurek
Roll Call: All ayes
The
3)
Gary L. Peterson, Mayor
Jo-Anne Student, Deputy City Clerk
Mayor Peterson acknowledged receipt of four petitions opposing the improvement of
three alleys and one letter supporting an alley improvement. These documents will be
placed on file with the approved minutes of the Public Improvement Hearing.
ADJOURNMENT
Motion by Jolly, second by Szurek to adjourn the Public Improvement Hearing at 11:12
p.m. Roll call: All ayes
Respectfully submitted,
Jo-Anne Student, Council Secretary
Page -23-