Loading...
HomeMy WebLinkAboutMarch 9, 1998 (2)OFFICIAL PROCEEDINGS COLUMBIA HEIGHTS CITY COUNCIL PUBLIC HEARING MARCH 9, 1998 o CALL TO ORDER/ROLL CALL The Public Hearing was called to order by the Mayor at 6:30 p.m. Present were Mayor Sturdevant and Councilmembers Szurek, Jolly, Ruettimann and Peterson. PRESENTATION OF INFORMATION BY STAFF ON PROJECT #961 - PROJECT #9801 Project #9801 is the sealcoating of bituminous City streets in Zone 3 as listed in the resolution. The Public Works Director reviewed the project. The total project cost is $140,143.76 of which $115,668.54 will be paid by the City. The remaining $24,475.22 will be assessed against benefitting properties at $2.31 per assessable street foot and $0.77 per assessable avenue foot. The assessment period is for one year. Discussion followed regarding material being considered for crack sealing and the associated costs for various types of aggregate. QUESTIONS AND ANSWERS There were no residents present to discuss the project. CONSIDERATION OF RESOLUTION NO. 98-33 Motion by Peterson, second by Jolly to waive the reading of the resolution there being ample copies available for the public. Roll call: All ayes RESOLUTION NO. 98-33 BEING A RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS WHEREAS, Resolution No. 98-25 of the City of Columbia Heights City Council adopted the 9th day of February, 1998, fixed a date for a council hearing on the proposed improvement of Zone 3, and pLrBLIC HEARING MARCH 9, 1998 PAGE 2 WHEREAS, ten days mailed notice and two weeks published notice of the heating was given, and the heating was held thereon the 9th day of March, 1998, at which all persons desiring to be heard were given an opportunity to be heard thereon, and WHEREAS, the Council determines to proceed with this local improvement, a portion of the cost being defrayed by special assessments under Charter provisions. NOW, THEREFORE, BE IT RESOLVED BY THE COI_;NCIL OF THE CITY OF COLUMBIA HEIGHTS, MINNESOTA: 1. That the location and extent of such improvements is as follows: Seal coating all bituminous City streets in Zone 3 listed below. Zone 3 is bounded by Central Avenue N.E. on the west, 45th Avenue N.E. and 47th Avenue N.E. on the south, Stinson Boulevard on the east and Corporate limits on the north. STREET PROJECT LIMITS Upland Crest Cheery Lane Khyber Lane Borelis Lane Central Ave. Service Drive 51 st Court Tyler Street Fairway Drive North Upland Crest Stinson Boulevard Heights Drive to Fairway Drive Fillmore Street to Cul-de-sac Fillmore Street to Cul-de-sac Fillmore Street to Cul-de-sac approximately 380' south to 50th Avenue to 195' north of 50th Avenue Central Avenue N.E. to Central Avenue N.E. 49th Ave. N.E. to 50th Ave. N.E. 49th Ave. to Fairway Drive Pennine Pass to Stinson Boulevard 5th St. N.W. to 325' north of centerline of North Upland Crest Work will include selective concrete curb and gutter replacement, crack sealing, bituminous surface patching and seal coat application. 2. Such improvement is necessary, cost effective, and feasible as detailed in the feasibility report. 3. Such improvement is hereby ordered as proposed in the Council Resolution adopted the 9th day of February, 1998. PUBLIC HEARING MARCH 9, 1998 page 3 4. These improvements shall also be known as P.I.R. #961, Project 9801. 5. Kevin Hansen is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement and advertise for bids. Adopted by the Council this 9th day of March, 1998 Offered by: Peterson Seconded by: Jolly Roll call: All ayes Mayor Joseph Sturdevant o-Ann~ Student, Coun'cil~g~retary ~vl~yor~Jo~eph Sturdevant Jo-Anne Student, Council Secretary ADJOURNMENT Motion by Szurek, second by Jolly to adjourn the Public Heating at 6:45 p.m. Roll call: All ayes